Similar Projects
New Bedford Hurricane Barrier Dewatering
Design
$1,000,000 to $5,000,000 est. value
New Bedford, MA

Corrugated Polyethylene Pipe
Bidding
Leicester, MA

Greenhouse Road Drainage Improvements 2019
Post-Bid
Less than $80,000 est. value
Sandwich, MA

Drainage Structures
Post-Bid
$800,000 est. value
Lowell, MA

Route 31 Culvert Replacement
Results
$816,014 est. value
Princeton, MA 01541

Birnie Avenue Culvert Headwall Replacement
Results
$327,000 est. value
West Springfield, MA 01089

Wilbraham Road Headwall Repairs
Post-Bid
Less than $127,917 est. value
Monson, MA

Scheduled and Emergency Drainage Structure and Pipe Cleaning at various Locations
Results
Less than $900,000 est. value

Installation of a Concrete Culvert and Road Reconstruction on Tiah’s Cove Road
Post-Bid
Less than $50,000 est. value
West Tisbury, MA 02568

Culvert and Drainage Repairs and Improvements at Various Locations along Interstate 90
Results
Less than $2,038,440 est. value

Drainage Installation Services
Post-Bid
Boston, MA

Herring Passage and Smelt Habitat Restoration
Results
$2,666,332 est. value
Weymouth, MA 02188

Culvert Cleaning and Maintenance Contract
Post-Bid
Lexington, MA

Ware River Branch - MP 16.50 Slope Stabilization
Results
Less than $985,000 est. value
New Braintree, MA

Foster Avenue Revetment Improvement Project
Post-Bid
Less than $800,000 est. value
Marshfield, MA 02050

Last Updated 12/18/2019 10:55 AM
Project Title

Stormwater Drainage Improvements and Related Work Along Section of Routes 24 and 79 and Interstate 195

Physical Address View project details and contacts
City, State (County) East Freetown, Fall River, Somerset, MA 02717   (Bristol County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,319,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1.000","Ls","Schedule Of Operations - Fixed Price $7000","100." "0.200","a","Clearing And Grubbing","101." "0.200","a","Selective Clearing And Thinning","102." "20.000","Hr","Tree Trimming Crew","102.001" "50.000","Hr","Control Of Invasive Plants Existing On Site","102.3" "10.000","Hr","Invasive Plant Prevention Plan","102.33" "50.000","Ft","Temporary Tree Protection Fence","102.52" "5800.000","Cy","Unclassified Excavation","120.1" "50.000","Cy","Test Pit For Exploration","141.1" "13.000","Cy","Class b Trench Excavation","142." "580.000","Cy","Class b Rock Excavation","144." "1.000","Ea","Drainage Structure Removed","146." "10.000","Cy","Ordinary Borrow","150." "60.000","Cy","Gravel Borrow","151." "350.000","Cy","Gravel Borrow - Type c","151.01" "120.000","Ton","Crushed Stone","156." "35.000","Cy","Dense Graded Crushed Stone For Check Dam","156.01" "1.000","Ls","Environmental Health And Safety Program","180.01" "10.000","Hr","Personal Protection Level c Upgrade","180.02" "10.000","Hr","Licensed Site Professional Services","180.03" "10.000","Ton","Disposal Of Unregulated Soil","181.11" "10.000","Ton","Disposal Of Regulated Soil - In-State Facility","181.12" "10.000","Ton","Disposal Of Regulated Soil - Out-Of-State Facility","181.13" "10.000","Ton","Disposal Of Hazardous Waste","181.14" "5.000","$","Catch Basin - Deep Sump","201.1" "3.000","Ea","Manhole","202." "4.000","Ea","Outlet Control Structure","209.6" "8.000","Ea","Drainage Structure Adjusted","220." "5.000","Ft","Drainage Structure Rebuilt","220.2" "1.000","Ea","Drainage Structure Change In Type","220.3" "1.000","Ea","Drainage Structure Remodeled","220.5" "4.000","Ea","Frame And Cover","221." "5.000","Ea","Frame And Grate - Massdot Bar Type","222." "1.000","Ea","Frame And Grate (Or Cover) Removed And Discarded","223.2" "100.000","Cy","Removal Of Drainage Structure Sediment","227.3" "12435.000","Ft","Removal Of Drainage Pipe Sediment","227.31" "15.000","Sf","Masonry Plug","227.4" "26.000","Ft","12 Inch Ductile Iron Pipe","238.12" "606.000","Ft","12 Inch Reinforced Concrete Pipe","241.12" "7.000","Ea","12 Inch Reinforced Concrete Pipe Flared End","242.12" "35.000","Sy","Stone For Pipe Ends","258." "32.000","Sy","Hot Mix Asphalt Waterway","280." "90.000","Ton","Hma For Patching","451." "10.000","Ton","Hot Mix Asphalt For Miscellaneous Work","472." "8.000","Ea","Granite Curb Type Va4 - Splayed End","504.2" "4.000","Ea","Granite Curb Inlet - Straight","514." "250.000","Ft","Edging Removed And Reset","583." "65.000","Ft","Edging Removed And Discarded","597." "495.000","Ft","Guardrail, Tl-3 (Single Faced)","620.13" "1.000","Ea","Terminal End Section","627." "1.000","Ea","Trailing Anchorage","627.1" "1.000","Ea","Transition To Nchrp 350 Guardrail","628.21" "10.000","Ft","Highway Guard Removed And Reset","630." "45.000","Ft","Highway Guard Removed And Discarded","630.2" "70.000","Ea","Silt Sack","697.1" "30.000","Sy","Geotextile Fabric For Separation","698.3" "12.000","Mo","Engineers Field Office And Equipment (Type a)","740." "1.000","Ls","Mobilization","748." "1800.000","Cy","Loam Borrow","751." "1.000","Ls","Npdes Stormwater Pollution Prevention Plan","756." "10600.000","Sy","Seeding","765." "2180.000","Sy","Seeding - Wetland/Basin Seasonally Flooded","765.554" "350.000","Ft","Sediment Control Barrier","767.121" "12200.000","Sy","Straw Mulch","767.31" "360.000","Sy","Jute Mesh Erosion Control Fabric","767.731" "600.000","Ft","Pavement Milling Mulch Under Guard Rail","769." "6.000","Ea","Spruce - White 5-6 Feet","774.638" "18.000","Ea","Serviceberry - Shadblow 4-5 Feet","782.810" "2000.000","Ea","Plug- Switch Grass","796.115" "1200.000","Sf","Safety Signing For Traffic Management","852." "6.000","Ea","Portable Breakaway Barricade Type Iii","853.1" "260.000","Day","Truck Mounted Attenuator","853.403" "20.000","Day","Temporary Illumination For Work Zone","853.8" "260.000","Day","Arrow Board","856." "150.000","Day","Portable Changeable Message Sign","856.12" "26000.000","Day","Reflectorized Drum","859." "20.000","Day","Reflectorized Drums With Sequential Flashing Warning Lights","859.1" "85.000","Ft","6 Inch Reflectorized White Line (Painted)","860.106" "85.000","Ft","6 Inch Reflectorized Yellow Line (Painted)","861.106" "1.000","Ea","Traffic Sign Removed And Reset","874.2" "75.000","Cy","Modified Rock Fill","983.52" "500.000","Sf","Sediment Forebay Paving","988.01"

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents