Similar Projects
Neumann Developments West Ryan Road Subdivision
New Construction
Design
Franklin, WI 53132

Remodeling & Repairs of 2862-2864 South 35th Street
Bidding
Milwaukee, WI 53215

Remodeling and Repairs at 4514 North 38th Street
Renovation
Bidding
Milwaukee, WI 53209

2846 North Frederick Avenue Single Family Residence
Post-Bid
Milwaukee, WI 53211

Roessgers Property Remodeling
Renovation, Addition
Post-Bid
Milwaukee, WI 53204

General Contracting - Housing Infrastructure
Renovation
Results
Milwaukee, WI 53208

General Contracting at 4444 North 26th Street
Renovation
Results
Milwaukee, WI 53209

Oak Creek Residential Development
New Construction - 19,968 SF
Pending Verification
$10,000,000 CJ est. value
Oak Creek, WI 53154

Remodeling and Repairs at 4044 North 19th Street
Renovation
Bidding
Milwaukee, WI 53209

Remodeling and Repairs at 6065 North 35th Street
Renovation
Post-Bid
Milwaukee, WI 53209

Building 3.1 Bid Package 2001-2007
Renovation
Results
Milwaukee, WI

Remodeling and Repairs at 8603 West Potomac Avenue
Renovation
Bidding
Milwaukee, WI 53225

Remodeling and Repairs at 4900 North 63rd Street
Renovation
Post-Bid
Milwaukee, WI 53218

Various Work Items for Building 3.1 (Westlawn Renaissance V) at Westlawn Gardens Phase 2
Renovation
Results
Milwaukee, WI

Remodeling and Repair of 6326 South 20th Street
Renovation
Bidding
Milwaukee, WI 53221

Reported 03/02/2022 12:00 AM
Project Title

Remodeling and Repairs at 5428 North 52nd Street

Physical Address View project details and contacts
City, State (County) Milwaukee, WI 53218   (Milwaukee County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1 Scrub Tree and Brush Removal: Around the perimeter of the houses foundation, remove all scrub trees and brush, and properly dispose of the waste. (The tress are causing damage to the house.) 2 Alarms: Install a combination smoke/CO alarm in the basement, first floor, second floor. All alarms shall be sealed battery, 10 year lithium ion units. 3 Basement Cleaning and Material Removal: Remove all of the owner's stored materials from the basement, and properly dispose or recycle (tires) the items. Clean the floors. 4 Moldy Divider Walls: Remove the wood stud and drywall divider walls entirely, and properly dispose of the materials 5 Mold Remediation: Clean and treat the foundation walls, and floors with mold-killing fungicide products. Use fans and dehumidifiers to completely dry out the basement, floor, and walls. When dry, prep the walls per the paint manufacturers recommendations, and paint the foundation walls with a mold inhibiting primer. 6 Stair Tread Repair: Repair or replace the broken stair tread, which is cracked along its entire length. 7 Sump Pump - Repair: Investigate the sump pump system, which is not removing water from the basin. Correct any issues blocking the discharge piping and/or pump. Clean all loose debris from the sump crock. 8 Sump Pump - Replacement: (Optional) If work item #7 does NOT correct the pumps functioning, install a replacement sump-pump 9 Dryer Vent: Replace the flexible dryer vent with a solid-walled galvanized steel vent pipe. 10 Kitchen Sink Faucet Replacement: Replace the (leaky) faucet with an owner approved faucet, with spray wand. 11 Sink Cabinet - Repair: Remove the rotten (water damaged) inside bottom of the sink cabinet. Install wood blocking supports, and a 5/8" thick (minimum) replacement panel - painted white 12 Stair Tread Repair: Repair of replace the tread which has a significant crack along it's entire length 13 Dryer Vent: Replace the flexible dryer vent with a solid walled galvanized vent pipe 14 Toilet Repair: Replace or repair the leaky flush valve. (Toilet runs continuously)

Details

Single-Family Homes, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents