Similar Projects
WWTP Consolidation Project Phase III
New Construction
Conception
$4,000,000 est. value
Pasadena, TX 77505

New Multi-Use Solid Waste Department Facility
New Construction
Design
Houston, TX 77026

Wastewater Treatment Plant Upgrades and Improvements 2017
Renovation
Bidding
$3,566,000 est. value
Houston, TX

Chlorine and Sulfur Dioxide Valve Replacement
Renovation
Bidding
La Porte, TX 77571

Clarifier Scum Screen
Post-Bid
Houston, TX 77020

White Oak WWTP Catwalk Grating Replacement
Renovation
Post-Bid
TX 77282

North Corridor Consolidation Package 1
Results
Less than $23,837,012 est. value
Houston, TX 77000

Ulitmate Wastewater Treatment Plant Phase 3 Expansion - 0.72 MGD - Construction
Results
$2,100,000 est. value
Houston, TX 77056

New 0.2875 MGD ADF Wastewater Treatment Plant
New Construction
Construction
$2,553,943 est. value
Houston, TX

Cypress Creek Interim WWTP 0.14 MGD
New Construction
Bidding
TX

On-Site Sludge Conveyor System Belt Modification Service
Renovation
Post-Bid
Houston, TX

Wastewater Treatment Plant Improvements 2020
Results
$119,000 est. value
Cypress, TX 77433

Wastewater Treatment Plant Improvements
Renovation
Post-Bid
TX

Permanent WWTP Improvements
Results
TX

Wastewater Treatment Plant Expansion
New Construction
Post-Bid
TX

Last Updated 03/15/2022 07:06 AM
Project Title

Wastewater Treatment Plant No. 1 Rehabilitation

Physical Address View project details and contacts
City, State (County) Cypress, TX 77429   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work to include but not limited to: 1. Drain and power wash for inspection Aeration Basin No. 1A, 1B, 2A and 2B; Digester Basin No. 1 and 2; Clarifier No. 1 and 2. Furnish and Install concrete crack repairs, as directed by the Engineer. Power wash exterior walls of all the concrete basins. Removal and disposal of all FRP stair treads and grating at Headworks and replace with galvanized stair treads and galvanized grating. Furnish and install access platform to Dechlorination Chamber. Removal, disposal and replacement of all blowers and motors. Abrasive blast and recoat headworks above ground piping and galvanized Air Header piping and all appurtenances. Power wash, spot hand tool clean, and recoat exterior wall surfaces of Existing Control Room Building and Elec/Chem/Bathroom Building. 2. Rehabilitate Existing Lift Station including but not limited to cleaning, power washing, abrasive blasting, and recoating of existing wet wells. Wet well piping and pump shall be replaced. Abrasive blast and re-coat above ground piping, fitting, valves, and appurtenances of Existing Lift Station. Provide bypass operations as needed for wet well rehabilitation. 3. Removal and Disposal of existing Generator No. 2 with generator pad. Furnish and install 175 kW Diesel Engine Generator, including sound attenuating enclosure, foundation, sidewalk, raised platform and appurtenances. Power wash, hand tool and/or power tool clean existing Generator No. 1 enclosure (Generator No. 1 to remain) and re-coat. 4. Electrical System Updates, including but not limited to installing all work shown on plans, removal and replacement of existing manual transfer switch, surge protect, conduit, ductbank, and all required appurtenances. 5. Storm sewer relocation and paving access road removal and replacement as needed for the storm sewer relocation. Storm Water Pollution Prevention Plan and Site Restoration.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents