Similar Projects
2022 Bond - Vigo County School Corporation
New Construction, Renovation
Conception
Less than $5,800,000 est. value
Libertyville, IN 47885

Centralized Service Center (Former Northview MS)
Renovation, Demolition - 292,340 SF
Design
Less than $18,800,000 est. value
Indianapolis, IN 46200

Auditorium Remodeling - Phase 2
Build-out
Design
$61,600 CJ est. value
Indianapolis, IN 46201

Valparaiso High School Kitchen Servery Renovation and Related Work
Renovation
Bidding
$500,000 CJ est. value
Valparaiso, IN 46385

Heritage Hills Pool Area Improvements
Infrastructure
Bidding
$85,000 CJ est. value
Lincoln City, IN 47552

IPS Interior and Exterior Hardening
New Construction
Post-Bid
Indianapolis, IN

Site Improvements
Infrastructure
Post-Bid
Indianapolis, IN

Hanover Central Middle School
Renovation, Addition
Results
Less than $5,000,000 est. value
Cedar Lake, IN 46303

Westfield Early Childhood Center and Central Administration Building Bid Package 2
Results
Indianapolis, IN 46214

Community and Education Center and Hilltop PK and Preschool
Renovation, Addition - 68,050 SF
Construction
Less than $19,398,000 est. value
Indianapolis, IN 46200

Crown Point Christian School Classrooms
Addition
Construction
$2,000,000 est. value
Saint John, IN 46373

Crown Point Christian School Classrooms Phase II
Addition
Pending Verification
$2,000,000 est. value
Saint John, IN 46373

second project
Build-out
Design
$61,600 CJ est. value
Indianapolis, IN 46201

Heritage Hills Track Improvements
Infrastructure
Bidding
$400,000 CJ est. value
Lincoln City, IN 47552

McGuire Hall at Richmond High School
Renovation
Post-Bid
Richmond, IN 47374

Last Updated 12/02/2022 02:38 PM
Project Title

Mechanical and Electrical Upgrades Pike Central High School

Physical Address View project details and contacts
City, State (County) Petersburg, IN 47567   (Pike County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $899,653 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The term Project as used herein shall refer to: Mechanical and Electrical Upgrades Pike Central High School Petersburg, Indiana. Base Bid shall include general construction, mechanical construction and electrical construction. A bid may not be withdrawn for a period of sixty (60) days following the time and date designated for the receipt of bids. All work shall meet requirements of the drawings, specifications and other Contract Documents prepared by Hafer. Costs for Performance and Labor and Material Payment Bond SHALL BE included in the contractor's bid. The bidder shall include with the Proposal Form the subcontractors and major material suppliers which the bidder will be using on the project. Once submitted, the bidder may not change a proposed subcontractor without Owner approval. Bidders should submit the Subcontractor/Material Supplier List with their bid. A Bid Bond or other form of bid security in the amount of 5% of the total bid IS REQUIRED. Provide Indiana State Form 96 and Financial Statement with Bid Proposal. Owner reserves the right to reject any and all bids and waive any and all informalities, whether or not the Bids comply with the prescribed requirements, and alternates and unit prices if requested in the Bid Forms. It may consider the qualifications and experience of Subcontractors and other persons and organizations (including those who are to furnish the principal items of material or equipment) proposed for those portions of the work for which the identity of Subcontractors and other persons and organizations must be submitted as specified in the "Information for Bidders". It may conduct such investigations as it deems necessary to establish the responsibility, qualifications and final ability of the bidders, proposed Subcontractors and other persons and organizations to do the work in accordance with the Contract Documents to Owner's satisfaction within the prescribed time. Each bidder shall visit the site of the proposed work and become fully acquainted with conditions as they exist so the Bidder may fully understand the facilities, difficulties, and restrictions related to the execution of the work under contract.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents