Similar Projects
Baekeland Avenue Improvements - Phase 1
Bidding
Piscataway, NJ 08855

2021 Road Improvement Program
Bidding
North Brunswick Township, NJ

Woodland Meadows Improvements
Post-Bid
Monmouth Junction, NJ

2019 Road and Sewer Improvements on Various Roads
Post-Bid
South Plainfield, NJ

Beekman Road Roadway Improvements
Results
$441,620 est. value
Monmouth Junction, NJ 08852

2018 Various Streets Paving
Results

Fresh Impressions Roadway Improvements Phase I
Bidding
Monmouth Junction, NJ

Southwood Drive Resurfacing Improvements
Post-Bid
Old Bridge, NJ 08857

2018 Roadway Paving and Reconstruction Project - Phase IV Improvements to Macarthur Avenue
Results
Sayreville, NJ 08871

Maintenance Roadway Contract C215
Bidding
$5,000,001 to $10,000,000 est. value
NJ

2019 CDBG Road Reconstruction Program Improvements
Post-Bid
Old Bridge, NJ 08857

FY 2017 Talmadge Road (Section 3) and Sutton Place Road Improvements
Results
Edison, NJ 08817

2021 Road Improvements on Various Roads
Bidding
South Plainfield, NJ

2018 NJDOT Road Improvements
Post-Bid
Jamesburg, NJ 08831

2019 Road Resurfacing Program Various Streets Contract 2
Results
Edison, NJ 08817

Last Updated 12/13/2019 10:11 PM
Project Title

Hercules Village Area - Roadway Paving and Reconstruction

Physical Address View project details and contacts
City, State (County) Sayreville, NJ   (Middlesex County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Generally consists of concrete, roadway paving / reconstruction and utility improvements, where applicable; to Cheesequake Road, Haig Street, Foch Street, Lena Street, Pershing Avenue and Bailey Place within the Hercules Village Area located in the Borough of Sayreville. The project also includes proposed sanitary sewer improvements that will be constructed within Borough rights-of-way and across private properties within existing / acquired utility easements. The work involved with these improvements includes the maintenance and protection of traffic; cutting and removal of existing trees, installation of new street trees; site clearing and grading operations for the proposed sanitary sewer improvements; installation of approximately 605 lineal feet of 12" / 15" / 18" RCP of various classes of storm sewer pipe reaches; construction of various types of new storm sewer inlet / manhole structures; reconstruction of existing storm sewer inlet / manhole structures; extending existing roof leader drains to new curb; relocate existing fire hydrant including all appurtenances, reset existing water / sanitary sewer valve boxes to grade; reset existing water service curb boxes and sanitary sewer cleanouts to finished grade; installation of approximately 350 lineal feet +/- of new 8" PVC SDR-35 pipe reaches; construction of 4 precast concrete standard, drop and doghouse type manhole structures with standard castings; abandoning of existing sanitary sewer line; removal and replacement of existing deteriorated sanitary sewer manhole castings; resetting of existing sanitary sewer manhole castings; removal of approximately 3,250 lineal feet +/- of various types of existing granite block / concrete curbs; removal of approximately 3,800 square feet +/- of various types of concrete sidewalks, slabs, driveways and/or aprons; construction of approximately 5,000 lineal feet +/- of new standard Borough concrete curb, approximately 900 square feet +/- of new standard Borough concrete sidewalk and approximately 2,600 square feet +/- of new standard Borough reinforced concrete driveways and aprons; furnishing and installation of cast-in-place handicapped sidewalk ramp delineation; restoration of hot mix asphalt and stone driveways; cutting / removal of approximately 8,700 square yards +/- of existing roadway asphalt pavement; the installation of dense graded aggregate base course, if and where ordered; installation of approximately 3,100 tons +/- of hot mix asphalt base course material, resurfacing the entire roadways with approximately 900 tons +/- of hot mix asphalt surface course material; application of pavement stripes / markings (lines and symbols); furnishing and installation of topsoil and sod as required; furnishing and installation of topsoil, seed and stabilization matting as required; easement / right-of-way restoration; and all other preparation, restoration and associated work in accordance with the Contract Documents.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents