Similar Projects
Group 4-17-ST 8
Infrastructure
Conception
$5,114,012 CJ est. value
Hawley, PA 18428

Group 4-17-ST 8
Infrastructure
Conception
$5,114,012 CJ est. value
Hawley, PA 18428

SR 652 Slide
Infrastructure
Design
$50,000 CJ est. value
Honesdale, PA 18431

SR 652 Slide
Infrastructure
Design
$50,000 CJ est. value
Honesdale, PA 18431

State Correctional Institute (SCI) Waymart - Exterior Building Envelop and Site Infrastructure Upgrades
Renovation, Infrastructure
Post-Bid
$4,000,000 CJ est. value
Honesdale, PA 18431

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

State Game Lands #183 Shooting Range Improvements
Results
Palmyra, PA

Daniels Road
Results
South Canaan, PA 18459

Scranton Municipal Golf Course Industrial Redevelopment
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Lake Ariel, PA 18436

SR 4010 over Shadigee Creek
Infrastructure
Conception
$250,000 CJ est. value
Starrucca, PA 18462

SR 4041 over Riley Creek
Demolition, New Construction, Infrastructure, Renovation
Design
$1,300,000 CJ est. value
Lakewood, PA 18439

Road Repair of Westcolang Road
Infrastructure
Post-Bid

Hawley Borough Paupack Street, Falls Avenue and Pike Street Improvements
Results
Hawley, PA 18428

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 3020 over Tributary Quinsigamund Lake
Demolition, New Construction, Infrastructure
Design
$1,150,000 CJ est. value
Waymart, PA 18472

Last Updated 05/05/2023 02:10 PM
Project Title

River Road (T-422) Culvert Replacement and Paving Project

Physical Address View project details and contacts
City, State (County) Prompton, PA 18456   (Wayne County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Bids may be held by Prompton Borough for a period not to exceed five (5) days from the date of Bid Opening for the purpose of reviewing the bids and investigating the qualifications of the bidder, prior to award of contract. Prompton Borough will award the bid to the lowest responsible bidder, reserving the right to waive any informality and accept or reject any and all bids. A bid bond for 10% of the base bid amount shall be provided with the bid. A Performance and Payment Bond in the amount of 100% of the contract amount shall be provided by the successful bidder within 20 days of the award. Any questions regarding this solicitation shall be submitted via the Questions feature within Electronically no later than Friday April 28, 2023, at 4:00 PM. The project briefly described is: Culvert Replacement and paving of River Road (+-1312 LF South of Roosevelt Highway & +-1300 LF North of Roosevelt Highway). Replace existing culvert. Sweep and Clean roadway. Apply tack coat. Apply Superpave 9.5 mm scratch/leveling course @ 0.06 T/SY over existing roadway. Apply Superpave 9.5 mm wearing course @ 0.09 T/SY and compact to 1.5 inches over existing pavement. Ensure a 5' driveway transitions. Place/Compact 2A Modified shoulders at 2.0 ft. minimum width, Apply tack coat to shoulders. The following Scope-of-Work is intended to supplement the project documents as prepared by Kiley Associates, LLC. This bid package includes construction work for culvert replacement and road repairs on roads within Prompton Borough. It also includes administrative and coordination responsibilities. All work indicated in the project documents is to be completed as in-scope without exception and includes, but is not limited to, the following: Contractor is responsible to clean their work area of all debris which is generated as a result of their work on a daily basis. Debris removal is the responsibility of the contractor. Provide all specified products and materials. Protection of surrounding areas and existing items to remain. All unloading/loading as required to complete this scope of work. All deliveries and staging area shall be coordinated with the Project Manager and Owner so as not To disrupt the Owner's ongoing use of the premises. Replace existing 36" RCP Culvert in accordance with attached GP-7 Permit and plan set. All road repair work as indicated in the contract documents. Work shall include the furnishing of all labor, equipment, tools, and materials required for the shaping of existing shoulders (including disposal of excess material), road base repair, shaping and compaction of roadway surfaces, pothole patching, leveling course and wearing course, all conforming to lines, grades, width, and depth, indicated in the contract documents and in accordance with PennDOT Pub 408, latest edition. Site Clearing and Grubbing / Site Demolition / Disposal of debris offsite including disposal costs Site Excavation, cut and fill, including compaction Maintenance and Protection of Traffic Offsite disposal of waste and unsuitable excavation, including disposal costs Saw-cutting existing pavement, temporary restoration with #2A stone Provide record drawings, manuals, instructions, certifications, and warranties as required General construction fees, mercantile taxes, and approvals as required Provide all accessories, supports and materials necessary to complete the intended work within this bid package The successful contractor is responsible to provide and pay for all temporary utilities The successful contractor is responsible for the security of their own materials, equipment, and tools throughout the duration of the project. The successful contractor will be required to provide Payment and Performance Bonds.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents