Similar Projects
Fremont Hall of Justice Systems Upgrade - Alameda County
Renovation
Conception
$639,046 est. value
Fremont, CA 94538

Cesar Chavez Park - New Restroom (On Spinnaker) - PRWT122015 - City of Berkeley
Renovation
Conception
$300,000 est. value
Berkeley, CA 94710

Casa Peralta Building
Renovation
Design
$4,000,000 CJ est. value
San Leandro, CA 94577

RFQ Contractor - Contractors Pre-Qualification Application California Uniform Public Construction Cost Accounting Act
Term Contract
Design
Alameda, CA 94501

2000 San Pablo Tenant Improvements (Phase 2)
Renovation - 27,000 SF
Bidding
$1,500,000 CJ est. value
Oakland, CA 94612

RFQ Contractor - Electrical Contractors and Subcontractors for Selected East Bay Municipal Utility District (EBMUD) Projects
Term Contract
Sub-Bidding
Oakland, CA 94612

Job Order Contracting
Renovation
Post-Bid
CA

Janitorial Services
Term Contract
Post-Bid
Oakland, CA 94612

Cathodic Protection for Transmission Pipelines at Various Locations, Phase 2
Renovation
Results
$3,274,440 CJ est. value
San Francisco, CA 94103

Elihu M. Harris Elevator Modernization
Renovation
Results
$10,671,000 CJ est. value
Oakland, CA 94612

Broadway Affordable Housing
Demolition, New Construction, Infrastructure - 306,460 SF
Pending Verification
$225,000,000 CJ est. value
Oakland, CA 94607

Replace Cooling Towers and Chillers in HVAC System at District 4 Headquarters in Oakland - California Department of Transportation
Renovation
Pending Verification
$282,000 CJ est. value
Oakland, CA 94612

African American Holistic Resource Center - PRWT122002 - City of Berkeley
New Construction
Conception
$5,666,667 est. value
Berkeley, CA 94704

District IT Office Expansion and Walk in Freezer Addition
Renovation
Post-Bid
$482,000 est. value
San Leandro, CA 94577

Corpyard - Green Room Lockers, Bathroom, Training, Room, Floor, Cabinets - Building B - PWT1CB2209 - City of Berkeley
Renovation, Infrastructure
Conception
$1,425,000 est. value
Berkeley, CA

Last Updated 10/05/2023 10:05 AM
Project Title

Sulphur Creek Nature Center Renovation

Physical Address View project details and contacts
City, State (County) Hayward, CA 94541   (Alameda County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $515,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Project involves the renovation of a nature center landscape that includes, but is not limited to: construction of a new outdoor shade structure with multi-purpose backdrop and storage, lawn restoration, construction of a new amphitheater with log seating, signage installation, and other miscellaneous improvements as shown on the plans. Construction activities shall minimize disturbance to animal residents. All inquiries and questions should be emailed to: Darcie DeLashmutt deld@haywardrec.org 510-750-4723 As security for its Bid, each bidder shall provide with its Bid form a bid bond issued by an admitted surety insurer on the form provided by the District, a cashiers check or a certified check, drawn to the order of the Hayward Area Recreation and Park District, in the amount of ten percent (10%) of the total bid price.This bid security shall be a guarantee that the Bidder shall, within seven (7) calendar days after the date of the Notice of Award, enter into a contract with the District for the performance of the services as stipulated in the bid. The successful Bidder shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if it is awarded the contract for the Project. The Districts Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received. If the District awards the Contract, the security of unsuccessful bidder(s) shall be returned within sixty (60) days from the time the award is made. Unless otherwise required by law, no bidder may withdraw its bid for ninety (90) days after the date of the bid opening. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents