Similar Projects
FMS - Facilities Support: Maintenance and Repair BPA
Term Contract
Bidding
$2,500 to $300,000 est. value
Roseburg, OR 97471

FMS - Facilities Support: Maintenance and Repair BPA
Term Contract
Bidding
$2,500 to $300,000 est. value
Roseburg, OR 97471

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC Filters, Installation and Coil Cleaning Services
Alteration
Results
$245,000 est. value
Hillsboro, OR

Pioneer Hall AC Replacement
Alteration
Results
$251,293 est. value
Bend, OR 97703

SE Campus MDF HVAC System
Alteration
Bidding
Portland, OR 97219

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Linn-Benton Community College Main Campus Takena Remodel Project
Alteration
Results
Albany, OR 97321

CB2 at Brewery Blocks 2 Building
Alteration
Bidding
Portland, OR

Residential HVAC Contractors
Term Contract
Post-Bid
OR

Shasta Elementary School Restrooms Remodel
Renovation, Alteration
Results
Klamath Falls, OR 97625

OR-Malheur NWR-HVAC
Term Contract
Bidding
Portland, Princeton, OR 97721

Medford School District MSDEC Annex HVAC Upgrades
Renovation
Post-Bid
Medford, OR 97501

Design-Build for Mechanical or HVAC
Alteration
Results
Springfield, OR 97477

Last Updated 02/03/2022 11:22 AM
Project Title

New Water Treatment System

Physical Address View project details and contacts
City, State (County) Waldport, OR   (Lincoln County)
Category(s) Single Trades
Sub-Category(s) HVAC, Plumbing
Contracting Method Competitive Bids.
Project Status Pre-Solicitation, Bidding Expected March 2022
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project scope includes construction of a submersible well pump, new 1" PE water service line and electrical supply to well, hydro-pneumatic water pressure tank, oxidation/filtration system, post-installation water testing, and all other components necessary for a complete and operational system. The pressure tank, filtration equipment, and controls shall be installed in a newly constructed 8' x 8' pumphouse which has been wired with adequate electrical power and has sleeves available for water service and electrical penetrations.

Details

Division 11 - Equipment.
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents