Similar Projects
Police Shooting Range - Town of West Hartford
New Construction, Infrastructure
Conception
$750,000 CJ est. value
West Hartford, CT 06110

Mountain Road, Albany Avenue Intersection - City of West Hartford
Infrastructure
Conception
$1,600,000 CJ est. value
West Hartford, CT 06117

West Street Hotel
New Construction, Infrastructure - 22,620 SF
Design
$6,800,000 CJ est. value
Southington, CT 06479

Cheshire Community Ymca
Alteration
Design
Southington, CT 06489

Downtown Traffic Signal Improvements - Phase I
Infrastructure
Bidding
$4,000,000 CJ est. value
Hartford, CT 06103

Gilbert Road Site Preparation
Infrastructure
Bidding
$6,078,000 CJ est. value
Newington, CT 06111

The Spark - 690 Cedar Street Apartments
New Construction, Infrastructure - 364,669 SF
Post-Bid
$55,000,000 CJ est. value
Newington, CT 06111

Goodwin Park Irrigation and Booster Pump Improvements
Infrastructure
Post-Bid
$1,450,000 CJ est. value
Hartford, CT 06114

Renovations and Improvements at Casey Field and E.G. Stocks Playground
Infrastructure
Results
$516,500 CJ est. value
Bristol, CT 06010

Crack Sealing and Color Coating Hard Surface Courts
Infrastructure
Results
$178,500 CJ est. value
Manchester, CT 06040

O'Reilly Auto Parts (ENF) #6484 / Enfield
New Construction, Infrastructure - 7,250 SF
Construction
$1,900,000 CJ est. value
Enfield, CT 06082

The Byline Luxury Apartments
Term Contract, New Construction, Infrastructure
Construction
$20,000,000 CJ est. value
West Hartford, CT 06107

Mastrianni Place Commercial Buildings
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Southington, CT 06489

Loukopoulos Building E
New Construction, Infrastructure - 12,600 SF
Pending Verification
$2,500,000 CJ est. value
Southington, CT 06489

Kennedy Park Improvements - Town of West Hartford
Infrastructure
Conception
$300,000 CJ est. value
West Hartford, CT 06119

Last Updated 04/04/2023 12:04 AM
Project Title

Franklin Area Consolidation Conduits: South Hartford Conveyance and Storage Tunnel (SHCST), Contract No. 4

Physical Address View project details and contacts
City, State (County) Hartford, CT 06103   (Hartford County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected November 2020 , Construction documents
Bids Due View project details and contacts
Estimated Value $83,977,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of May 20, 2020, The contract was not awarded. They only had one bidder and the bid was significantly higher than the Engineer’s estimate. They are currently reevaluating the design and how to proceed with a future bidding process. ** The Work shall consist of all labor, equipment, fees, permits, and other related costs necessary to provide for conduit construction along with support equipment and accessories as shown and specified. Bidders are directed to Section 01010 Summary of Work for specific details. The Work shall be located in the City of Hartford; in the State of Connecticut as shown on the Drawings and specified therein. The project is being funded by the Department of Energy and Environmental Protection (DEEP) Clean Water Fund. Each Bid shall be submitted in strict accordance with the Instructions to Bidders and shall be accompanied by a Bid Security in the amount of 10 percent of the Bid. Bidders on this work are required to comply with 40 CFR Part 33.240 of the United States Environmental Protection Agencys policy on the increased utilization of Minority Business Enterprises (MBEs) and Women Business Enterprise's (WBE's). The requirements for bidders and contractors covered by this policy are explained in the Instructions to Bidders. Bidders and subcontractors to this work will be required to comply with the President's and State of Connecticut Executive Order No. 11246, 3, 17, 16 and any amendments or supplements to those Executive Orders. Any contract or contracts awarded under this invitation for bids are expected to be funded in part by the State of Connecticut Department of Energy and Environmental Protection. Neither the State of Connecticut nor any of its departments, agencies or employees is or will be a party to this invitation for bids or any resulting contract. This procurement will be subject to the requirements contained in subsections (h), (j) and (o) of Section 22a-482-4 of the Regulations of Connecticut State Agencies. A copy of these Regulations is included in the Supplementary Conditions. The Bidder shall hold a current DAS Contractor Prequalification Certificates in TUNNELLING or SEWER AND WATER LINES from the Department of Administrative Services of the State of Connecticut according to C.G.S 4a-100, C.G.S. 4b-101 and C.G.S. 4b-91. Bidders shall submit with their Bids their DAS Contractor Prequalification Certificate along with a current Update Bid Statement. In addition, any named Subcontractor whose subcontract value is equal to or greater than $500,000 shall hold a current DAS Contractor Prequalification Certificate in the closest applicable Classification of the work that the Subcontractor will complete in the contract. The bidder must submit with their bid, all applicable Subcontractor DAS Prequalification certificates. Any Bid submitted without a copy of the DAS Prequalification Certificate and an Update Bid Statement for the bidder and DAS Prequalification Certificates for Subcontractors whose subcontract value is equal to or greater than $500,000 shall be invalid. Since MBE/WBE Subcontractors are not required to be named at bid submission, Bidders do not need to include MBE/WBE Subcontractor Prequalification Certificates with their bids. However, as to proposed MBE/WBE Subcontractors whose subcontract value is equal to or greater than $500,000, the DAS Contractor Prequalification Certificate is not required with the bid, but within 14 days of the notification of designation as the apparent low bidder, the apparent low bidder shall submit to the Owner a current DAS Contractor Prequalification Certificate in each appropriate work classification for each such MBE/WBE Subcontractor. Bidders do not need to include MBE/WBE Subcontractor Prequalification Certificates with their bids. The Successful Bidder and each of its Subcontractors having subcontracts in value equal to or greater than $500,000 shall maintain and keep current their respective DAS Contractor Prequalification Certificates at all times during the term of the Contract and any warranty period set forth in the Contract Documents. Questions concerning the Bid submittal process such as formats, forms, and bonding should be referred to the Owners Contract Specialist, Ted Sweeney, at telephone 860-278-7850, Ext. 3361 between the hours of 8:00 a.m. to 4:00 p.m., Monday through Friday, except holidays. Questions about the meaning or intent of the Contract Documents shall be received only by email to the Owners Contract Specialist, Ted Sweeney, at tsweeney@themdc.com no later than 4:00 PM on February 7, 2020. All inquiries should include a subject line beginning with 2015B-34 Bid Period Inquiry, #, Organization replacing # with the inquiry # (beginning with 1) and replacing Organization with the name of the organization submitting the inquiry.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents