Similar Projects
Burlington High School Campus Overhaul
Renovation, Addition
Post-Bid
$70,000,000 est. value
Burlington, VT 05401

Winooski School District Addition and Renovation Project Management
Post-Bid
Less than $48,600,000 est. value
Winooski, VT 05404

Winooski School District Addition and Renovation
New Construction, Renovation - 208,000 SF
Post-Bid
Less than $48,600,000 est. value
Winooski, VT 05404

2020 LUHS Repairs
Renovation
Results
$1,250,000 est. value
Hyde Park, VT 05655

650 Main Street Mixed Use
Renovation - 120,000 SF
Construction
Less than $800,000 est. value
Bennington, VT 05201

Founders Hall
New Construction - 25,000 SF
Construction
$20,000,000 est. value
Manchester, VT 05254

Spaulding Educational Alternatives Facility
Results
$1,800,000 to $1,900,000 est. value
Barre, VT 05641

School Nurses Office Renovations
Renovation
Post-Bid
Fair Haven, VT 05731

Burr and Burton Academy Smith Center
Renovation
Conception
Manchester, VT 05254

Charlotte Central School Limited Renovations
Renovation
Post-Bid
$3,101,000 est. value
Charlotte, VT 05445

Reported 06/08/2020 10:01 AM
Project Title

Mt. Abraham Middle High School Renovation Project

Physical Address View project details and contacts
City, State (County) Bristol, VT 05443   (Addison County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method
Project Status Construction Commenced May 2020, Construction Completion Expected August 2020
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The main components of the Project include renovation of the locker rooms. The project includes new walls and wall tile, new doors, epoxy flooring, lockers, plumbing fixtures and piping, ceilings, lighting and a new HVAC system.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents