Similar Projects
East-West BRT Intersection
Post-Bid
Milwaukee, WI

Milwaukee Mitchell International Airport T & M Metal Fabrication & Asphalt Paving
Term Contract
Post-Bid
Milwaukee, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Resurfacing
Renovation
Results
Glendale, Milwaukee, WI

2021 Time And Material Zoological Gardens
Term Contract
Post-Bid
Milwaukee, WI

2021 Green Infrastructure Upgrades Bid Package 2
Results
Milwaukee, WI 53204

Asphalt High Impact Paving- Group 3
Post-Bid
Milwaukee, WI

Sidewalk High Impact Paving Work
Results
Milwaukee, WI

Remodeling and Repairs 2820 N 22Nd Street
Renovation
Post-Bid
Milwaukee, WI

2021 Street Improvement Program
Results
Bayside, WI 53217

Asphalt High Impact Paving- Group 4
Post-Bid
Milwaukee, WI

2021 Sidewalk Improvement Program
Results
$75,000 est. value
Milwaukee, WI

2021 Road Improvement Program
Post-Bid
Saint Francis, WI

Underwood Creek Parkway Road Replacement
Results
Wauwatosa, WI 53222

City-Wide Water Main Trench Repair
Post-Bid
Saint Francis, WI

Last Updated 07/22/2022 05:02 PM
Project Title

Alley Paving Work and Safe Route to School (SRTS)

Physical Address View project details and contacts
City, State (County) Milwaukee, WI 53202   (Milwaukee County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

OFFICIAL NOTICE NO. 79 - 2022 Project No. 1 Time for Completion: All work on ST212140109, ST212210103, ST212210104, ST214220101 shall be completed by October 31, 2022. No work on ST221210313: Westside Academy - 2 intersections: North 31 st Street and West Brown Street & North 32 nd Street and West Lisbon Avenue, may begin until the Contractor has been given approval by the Chief Construction Engineer, Mr. Anthony Kotecki. The Contractor will need to contact Mr. Anthony Kotecki at (414) 708-3886, as soon as the contract is awarded. Work on ST221210313 may take place in 2023. There will be no extra costs given for any work needed to be done in 2023. Liquidated Damages, per diem: $1000.00/Day The residency requirement for this project is 40% of all hours worked on the project. One quarter of these hours must be attributable to residents living in the following zip codes: 53204, 53205, 53206, 53208, 53210, 53212, 53215, and 53233. Located at the following Alley(s) Bounded By (ABB) & Intersections: ST212140109 - ABB: West Becher Street, West Rogers Street, South 35 th Street, to South 36 th Street ST212210103 - ABB: West Hope Avenue, West Marion Street, North 62 nd Street, to North 63 rd Street ST212210104 - ABB: West Euclid Avenue, West Ohio Avenue, South 12 th Street, to South 13th Street ST214220101 - ABB: West McKinley Avenue, West Vliet Street, North 20 th Street to North 21 st Street ST221210313 - West Side Academy - 2 Intersections: North 31 st Street and West Brown street & North 32 nd Street and West Lisbon Avenue (SRTS) The SBE requirement for this project is 25% of the contract base bid. The SBE Compliance Plan (Form A) must be submitted with the bid and is an element of bid responsiveness. SBE certificates must be submitted with the Form A. Incomplete SBE Compliance Plans (Form A) or inaccurate SBE Compliance Plans will not be accepted and will render the bid unresponsive. The apprenticeship requirements for this project is: 0. If this contract is awarded at $500,000 or higher, 25% of all apprentice labor hours must be worked by apprentices certified for participation in the Residents Preference Program and 40% of all apprentice labor hours must be attributed to apprentices living in the following zip codes: 53204, 53205, 53206, 53208, 53210, 53212, 53215, and 53233 The contractor shall specifically note the SBE, residency, and apprenticeship forms for this project. If the forms are not filled out properly, it will be cause for rejection of the bid. Bid Security Required: Bond, Certified Check, Cashier's Check or Cash to accompany bid: 10% of the Contractor's Base Bid. PROJECT 814-1109 PROJECT/GRANT ST212140109 ESTIMATE 29315 Alley betw. W. Becher St., W. Rogers St., S. 35th St., S. 36th St. (Permeable alley) PROJECT - PROJECT/GRANT ST221210313 ESTIMATE 30598 PROJECT 821-1103 PROJECT/GRANT ST212210103 ESTIMATE 30618 Alley betw. W. Hope Av., W. Marion St., N. 62nd St., N. 63rd St.(Permeable alley) PROJECT 821-0104 PROJECT/GRANT ST212210104 ESTIMATE 30619 Alley betw. W. Euclid Av., W. Ohio Av., S. 12th St., S. 13th St. (Permeable alley) PROJECT 814-2201 PROJECT/GRANT ST214220101 ESTIMATE 30731 PROJECT BREAKDOWN OFFICIAL NOTICE # 79-1 07/18/2022 09:16:55 AM West Side Academy - 6 intersections: N. 31st St. and N. 32nd St./W. Brown St., W. Vine St. and W. Lisbon Ave. (SRTS) Alley Betw. W. McKinley Av.(ext'd), W. Vliet St., N. 20th St., N. 21st St. (new alley for DCD)(Permeable alley)

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents