The Piazza at Former Star City Site - Master Plan
New Construction - 51,100 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Bridgeville, PA 15017

Monongahela Riverfront for Recreational Use - Master Plan
New Construction
Conception
Pittsburgh, PA 15207

Pittsburgh Penguins Former Arena Site - Entertainment Facility by Live Nation and Parking Garage
New Construction - 40,000 SF
Design
$3,000,000 est. value
Pittsburgh, PA 15219

Lot 10 - North Shore Entertainment Building and Plaza
New Construction
Design
$4,500,000 est. value
Pittsburgh, PA 15212

Hemlock 2 Ballfield Outfield Reconstruction
Renovation
Bidding
Green Tree, PA

Wexford Run - Neely School Trail
Bidding
Wexford, PA 15090

South Park Trail Improvement Project
Post-Bid
South Park Township, PA 15129

Larimer Playground & Village Green
Post-Bid
Pittsburgh, PA 15206

Construction of the Bellevue Memorial Park
Results
$225,000 to $275,000 est. value
Bellevue, PA 15229

North Park Pool Bleacher Repair
Results
Allison Park, PA 15101

Hazelwood Green Plaza
New Construction - 86,196 SF
Construction
$4,975,000 est. value
Pittsburgh, PA 15207

3 Crossings Phase 2 - Building G Hopper Place Office and Park
New Construction - 150,000 SF
Construction
$12,575,000 est. value
Pittsburgh, PA 15222

Kaufmann's Grand on Fifth - Rooftop Ice Skating Rink
New Construction
Conception
Pittsburgh, PA

Frick Park - Phase 2
Renovation
Design
Pittsburgh, PA 15217

3rd Street Park Revitalization
Infrastructure
Bidding
Less than $83,000 est. value
McKees Rocks, PA 15136

Last Updated 05/20/2021 04:01 AM
Project Title

Trail Maintenance II

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA 15219   (Allegheny County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Period of Contract: June 15, 2021 through October 31, 2023. These projects propose the construction of new sections of 3' wide, sustainable, multi-use trail in the Allegheny County Parks. Distances and terrain will vary from project to project but have been defined by maximum linear feet. Terrain/trail feature descriptors have been included in the project list. Projects may cross small ephemeral streams, drainages, abandoned mine land features (pits, high walls, debris piles), seasonally wet areas, or steep slopes. Much of the work will consist of corridor vegetation clearing and earthwork to establish trail tread. Tread work may include: cutting new tread, establishing out slope, creating drains (dips and knicks) and rollers, creating rock drains, creating elevated tread, creating switchbacks or climbing turns. Where noted in the project list, projects may include the decommissioning of the former trail(s) and is also to be completed as part of this bid. This may consist of uncompacting existing soils, spreading organic debris collected from new trail construction and moving large downed trees to block/disguise old trail corridor. All disturbances outside the trail corridor made by the contractor must be repaired to reflect the landscape as it appeared prior to the project. Any necessary materials (gravel, boulders, and seed) will be furnished by the County. If bridges or other timber structures are required, they are not part of this project scope and will be installed by Allegheny County.

Details

Park/Playground, Renovation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents