Similar Projects
145th AW Add/Alter Small Air Terminal
Addition - 15,700 SF
Post-Bid
$5,000,000 to $10,000,000 est. value
Charlotte, NC

Johnson Regional Airport Hangar and Office Space
New Construction
Post-Bid
Smithfield, NC

Shelby T-Hangar and Taxilane Phase 2
Renovation
Results
Shelby, NC

Corporate Hangars 27, 28, 29, 30 And 31
New Construction - 59,200 SF
Results
$5,000,000 to $10,000,000 CJ est. value
Greenville, NC

Schedule 1 - New Corporate Hangar and Schedule 2 - Site Work and Utility Improvements
Construction
Roxboro, NC 27573

EWN Corporate Box Hangars
New Construction
Construction
$5,000 to $9,999 est. value
New Bern, NC 28562

Blue Line Aviation
New Construction
Pending Verification
Smithfield, NC

Hangar Replacement and Access Road/Parking Improvements
Renovation, Infrastructure
Post-Bid
Stoneville, NC

T-Hangar Area Development Fayetteville Regional Airport
Renovation
Results
Fayetteville, NC

Hickory Airport Hangar
Renovation
Construction
Hickory, NC

T-Hangar and Hangar Taxilanes Site Preparation and Paving
New Construction, Infrastructure
Post-Bid
Burlington, NC

T-Hangar Building
New Construction
Results
North Wilkesboro, NC 28659

Clt Concourse A Expansion - Phase 2
Addition - 191,000 SF
Post-Bid
$138,500 est. value
Charlotte, NC 28263

Asheboro Regional Airport Corporate Hangar
New Construction
Results
$700,000 est. value
Asheboro, NC

Repair and Renovate Aircraft Maintenance Hangar
Renovation
Post-Bid
$10,000,000 to $25,000,000 est. value
Charlotte, NC 28208

Last Updated 05/26/2022 01:35 AM
Project Title

P197 DB Aircraft Maintenance Hangar, MCAS Cherry Point, NC

Physical Address View project details and contacts
City, State (County) Cherry Point, NC   (Craven County)
Category(s) Transportation
Sub-Category(s) Aircraft Hangar
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $181,430,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project constructs a two story low rise two squadron module Type 1 maintenance hangar for the F-35B Lightning II aircraft including a high bay space, crew and equipment space, and administrative space. The building will be concrete masonry unit (CMU) on a pile supported reinforced concrete slab-on-grade foundation with structural steel framing, steel roof trusses and pre-finished insulated metal roof. Special construction features include 400Hz and 270v DC power, aircraft maintenance work stations, hanger work station kiosks, alarm systems, communication connections at aircraft parking locations, seismic construction, hazardous material storage areas, explosive material storage areas, sound attenuation, and vaults. Project includes taxiway remarking and the renovation to existing aircraft parking aprons in order to provide electrical grounding, work station kiosks and sun shades.

Details

Division 03 - Concrete, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 21 - Fire Suppression.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Rigid Paving, Concrete Paving, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents