Similar Projects
Mount Troy Road Extension Site 2 Slope Stabilization
Infrastructure
Bidding
Pittsburgh, PA

2021 Bauman Avenue Drainage Improvement Project
Infrastructure
Bidding
$170,000 to $180,000 est. value
Brentwood, Pittsburgh, PA 15227

Corrugated Metal Pipe
Post-Bid
Pittsburgh, PA 15123

Semicir Street Landslide Remediation
Post-Bid
Pittsburgh, PA 15214

Scott Township CD 44 7.5 Georges Run Stream Restoration
Results
Pittsburgh, PA

Carrie Furnace Redevelopment Project - Western Phase
Results
$1,300,000 to $1,500,000 est. value
Monroeville, PA 15146

Reinforced Concrete Products
Post-Bid
Monroeville, PA

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Cowley Park Landslide Remediation
Post-Bid
Pittsburgh, PA 15219

SR 2064, Lime Hollow Road Slide
Results
$2,500,000 to $4,999,999 est. value
PA

Bairdford Park Master Plan Construction B-1 Ballfield Project
Post-Bid
$85,000 est. value
Cheswick, PA 15024

Waterworks Park Reservoir Liner and Cover Replacement
Results
$200,000 est. value
Sewickley, PA 15143

Combined Sewer Overflow Debris Control
Post-Bid
$30,000 est. value
Etna, PA 15223

Municipal Building Stormwater Pond
Results
Presto, PA 15142

Dura-Hold Retaining Wall Units
Post-Bid
Pittsburgh, PA 15219

Reported 06/16/2021 12:00 AM
Project Title

Heartwood Drive Detention Pond

Physical Address View project details and contacts
City, State (County) Upper Saint Clair, PA 15241   (Allegheny County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves the unclassified bulk excavation and sediment removal of a stormwater detention facility; removal and haul-off of excavated material; erosion and sediment control BMPs; installation of 30” concrete endwall, 30” SLCPP wt joint pipe, outlet control structure, and emergency spillway; site restoration and landscaping; utility coordination; and resident notifications, complete in place.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents