Last Updated | 08/02/2022 01:01 PM |
Project Title | STH 72, Ellsworth - Downsville, Pierce/Dunn County Line to STH 25 |
Physical Address | View project details and contacts |
City, State (County) | Menomonie, WI 54751 (Dunn County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Obtained from a credible source, Awaiting verification, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $6,000,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of August 2, 2022, an engineer has been selected and this project is in the design phase. Although a firm timeline for construction has not been determined, construction is not expected to start prior to December 2022. *The closed solicitation has been included below for reference: Solicitation ID: NW-01 County :17 - Dunn County Limit : Pierce/dunn County Line to Sth 25 Anticipated Construction Cost: $5,000,000-$5,999,999 The pavement needs treatment to extend the service life and minor culvert/structure work The perpetuation project will mill and overlay with HMA approximately 10.084 miles from Pierce/Dunn County Line to STH 25 in Dunn County. Other work includes adding riprap to culvert C-17-0967, seal joints on culvert C-17-0966, replacing wing walls on bridge B-17-0121, roadway culverts cleaning and lining, beam guard replacement, gravel shouldering, roadside clearing, pavement markings, and restoration. Roadway operations may be improved at the intersections of STH 28 and STH 57 - potential realignment, WIS 57 and CTH U - restricted crossing U-turn (RCut, STH 57 and CTH C - slotted left turn lanes, and STH 57 and CTH J - single lane roundabout. Major tasks include preliminary design, review of environmental impacts, drainage analysis, final design, secondary ICE analysis and PS&E preparation. Advertised Fixed Fee %: : 7.25 The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. Interviews will not be conducted The method of contractor selection has not been determined at this time. Wis DOT - RFP Engineering - Ellsworth - Downsville *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |