Similar Projects
Coe Street
Infrastructure
Bidding
$2,000,000 CJ est. value
Ridgeland, WI 54763

Coe Street
Infrastructure
Bidding
$2,000,000 CJ est. value
Ridgeland, WI 54763

2021 Road Improvements
Infrastructure
Post-Bid
Sand Creek, WI

2021 Road Paving
Infrastructure
Post-Bid
Sand Creek, WI 54757

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Site Utility Distribution System Replacement - Phase 1
Results
$3,000,000 est. value
Menomonie, WI 54751

LRIP Project - 665th Street
Infrastructure
Bidding
$700,000 CJ est. value
Wilson, WI 54763

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

1058th Avenue Paving & 970th Avenue Chip Sealing
Results
Wheeler, WI

Menomonie State Patrol Safety and Weight Enforcement Facility (SWEF) Scale Replacement
Infrastructure
Bidding
$200,000 CJ est. value
Peru, WI 54751

Blacktop
Infrastructure
Post-Bid
Clear Lake, WI 54005

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

Town Road Reconstruction
Infrastructure
Post-Bid
$284,000 est. value
Modena, WI

Crestwood Acres Neighborhood Street Reconstruction
Results
Weston, WI

Menomonie - Ridgeland; S Fork Lower Pine Creek C-17-0049
New Construction, Infrastructure
Post-Bid
$500,000 to $749,999 est. value
Menomonie, WI 54751

Last Updated 08/02/2022 01:01 PM
Project Title

STH 72, Ellsworth - Downsville, Pierce/Dunn County Line to STH 25

Physical Address View project details and contacts
City, State (County) Menomonie, WI 54751   (Dunn County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Obtained from a credible source, Awaiting verification, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $6,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 2, 2022, an engineer has been selected and this project is in the design phase. Although a firm timeline for construction has not been determined, construction is not expected to start prior to December 2022. *The closed solicitation has been included below for reference: Solicitation ID: NW-01 County :17 - Dunn County Limit : Pierce/dunn County Line to Sth 25 Anticipated Construction Cost: $5,000,000-$5,999,999 The pavement needs treatment to extend the service life and minor culvert/structure work The perpetuation project will mill and overlay with HMA approximately 10.084 miles from Pierce/Dunn County Line to STH 25 in Dunn County. Other work includes adding riprap to culvert C-17-0967, seal joints on culvert C-17-0966, replacing wing walls on bridge B-17-0121, roadway culverts cleaning and lining, beam guard replacement, gravel shouldering, roadside clearing, pavement markings, and restoration. Roadway operations may be improved at the intersections of STH 28 and STH 57 - potential realignment, WIS 57 and CTH U - restricted crossing U-turn (RCut, STH 57 and CTH C - slotted left turn lanes, and STH 57 and CTH J - single lane roundabout. Major tasks include preliminary design, review of environmental impacts, drainage analysis, final design, secondary ICE analysis and PS&E preparation. Advertised Fixed Fee %: : 7.25 The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. Interviews will not be conducted The method of contractor selection has not been determined at this time. Wis DOT - RFP Engineering - Ellsworth - Downsville *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents