Similar Projects
North East Yacht and North East 32nd to 30th - City of Lincoln City
New Construction, Infrastructure
Conception
$250,000 est. value
Lincoln City, OR 97367

Eckerd Avenue, 2nd Street and Lola Avenue Sewer and Water Line Replacement
Infrastructure
Bidding
$1,020,000 to $1,500,000 est. value
Molalla, OR

Public Improvement Fir Grove Loop Large Meter Replacement
Infrastructure
Bidding
$100,001 to $1,000,000 est. value
Hillsboro, OR

FMS - Facilities Support: Maintenance and Repair BPA
Term Contract
Post-Bid
$2,500 to $300,000 est. value
Roseburg, OR 97471

South West 209th Avenue Kinnaman Road to Alexander Street 36-Inch PVC Pipe
Infrastructure
Post-Bid
$150,000 to $200,000 est. value
Aloha, OR 97007

Canby And East Streets Watermain Replacement
Infrastructure, Alteration
Results
$450,000 to $500,000 est. value
Klamath Falls, OR 97625

Awbrey Butte Distribution Improvements
Alteration
Results
Bend, OR

Whiskey Creek - North Project
Term Contract
Bidding
$200,000 est. value
Dee, OR 97031

Water Transmission Pipeline
Infrastructure
Post-Bid
$15,000,000 to $20,000,000 est. value
Sherwood, OR 97140

Water System Improvements - Phase I - Collector Well No. 3 - 2022
Infrastructure
Results
$2,600,000 to $2,900,000 est. value
Boardman, OR

Aerial and Ground Utility Locating Services
Infrastructure
Bidding
Salem, OR

Washington Way Advanced Utilities
Alteration
Post-Bid
Corvallis, OR 97333

Nixyaawii One
Infrastructure
Results
$4,000,000 est. value
Pendleton, OR

Large Meter Replacement Public Improvement ITB
Infrastructure
Bidding
$50,001 to $100,000 est. value
Hillsboro, OR

Drinking Water Distribution System Replacement Project
Term Contract
Post-Bid
Bly, OR

Last Updated 07/04/2022 09:03 AM
Project Title

South West 7th Street and South West Kings Byway Water Main Upsizing

Physical Address View project details and contacts
City, State (County) Troutdale, OR 97060   (Multnomah County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work on the SW 7th St. and SW Kings Byway Water Main project consists of on-site work, as follows: - Installation of approximately 1218 ft of 12-inch Water line - Abandonment of the existing 6-inch water main - Replacement of service lines, meter boxes, and meters - Reconnection to existing mains at intersections - Reconnection of two existing fire hydrants - Installation of 3 new fire hydrants - One 12" X 12" hot tap, one 10" X 10" hot tap, one 6" X 6" hot tap, and one 6" temporary line stop. - Installation of a new storm drain manhole - Installation of one new sanitary sewer lateral. - Installing of an air/vacuum valve assembly - Asphalt, sidewalk, curb, and landscape restoration On-site work is to be substantially complete within three months from the notice to proceed. PREVAILING WAGE: This is a contract for a public work subject to ORS 279C.800 to 279C.870. PRE-QUALIFICATION: Prequalification is not required Questions and requests for clarification related to this Work shall be directed to the project engineer, Erik Hoovestol, P.E., Firwood Design Group, 359 E. Historic Columbia River Highway, Troutdale, OR, 97060, 503-668-3737, eh@firwooddesign.com.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents