Similar Projects
San Isidro Branch Library - 08-LIB-002 - City of Laredo
New Construction, Infrastructure - 12,000 SF
Conception
$3,500,000 CJ est. value
Laredo, TX 78040

Fire Station 3 (San Bernardo) - 23-FIRE-004 - City of Laredo
Demolition, New Construction, Infrastructure - 7,850 SF
Conception
$2,750,000 CJ est. value
Laredo, TX 78040

North Laredo Business Park Building 3
New Construction, Infrastructure - 236,390 SF
Design
$14,183,400 CJ est. value
Laredo, TX 78040

UHS Laredo Clinic / Villas San Augustin Plaza
New Construction, Infrastructure - 7,130 SF
Design
$1,700,000 CJ est. value
Laredo, TX 78045

Dollar Tree #9327 / Laredo
New Construction, Infrastructure - 7,725 SF
Bidding
$2,040,000 CJ est. value
Laredo, TX 78040

Freer TX Border Patrol Station (BPS) Complex
LEED Certification, New Construction, Infrastructure - 47,000 SF
Post-Bid
$100,000,000 CJ est. value
Freer, TX 78357

Manadas Creek Drainage Improvements North Central Park Phase 1C Water Feature
Infrastructure
Post-Bid
$300,000 CJ est. value
Laredo, TX 78040

South Laredo Wastewater Treatment Plant Belt Filter Presses Replacement Project
Renovation
Results
Laredo, TX 78046

Manadas Creek Wastewater Treatment Plant
New Construction
Results
Laredo, TX 78045

Freddy's Frozen Custard & Steakburgers / Laredo
New Construction, Infrastructure - 2,996 SF
Construction
$1,550,000 CJ est. value
Laredo, TX 78045

North Laredo Business Park Building 2 Shell / Laredo
New Construction, Infrastructure - 206,588 SF
Construction
$12,395,280 CJ est. value
Laredo, TX 78040

IHOP-Laredo
New Construction, Infrastructure
Pending Verification
$1,200,000 CJ est. value
Laredo, TX 78043

TPA Hachar - Building 3
New Construction, Infrastructure - 458,648 SF
Pending Verification
$27,518,880 CJ est. value
Laredo, TX 78040

8"-15" IH 69 SS Relocations - District 5 - 18-WW-001 - City of Laredo
Infrastructure
Conception
$2,000,000 CJ est. value
Laredo, TX 78042

Las Lomas Car Wash
New Construction, Infrastructure - 1,000 SF
Design
$350,000 CJ est. value
Laredo, TX 78046

Last Updated 03/02/2023 03:04 PM
Project Title

EL Pico Water Treatment Plant High Service Pump Station Improvements

Physical Address View project details and contacts
City, State (County) Laredo, TX 78045   (Webb County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $806,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

For the furnishing of all necessary materials, machinery, equipment, labor, superintendence, and all other services and appurtenances required for the El Pico WTP High Service Pump Station Improvements The scope of work shall include the demolition of three (3) existing pump control valves and adjacent piping and supports at the El Pico WTP High Service Pump Station. The scope also includes the installation of three (3) Owner-furnished check valves, three (3) Ownerfurnished magnetic flow meters, three (3) differential pressure transmitters, pressure gauges, piping, appurtenances, supports, and all incidental works as shown on the drawings and specifications. The contractor is responsible for integration of the flow meters and pressure transmitters into the existing PLC and SCADA system. Contractor shall provide all labor, machinery, materials & incidentals necessary to complete the project. The Utilities Department will allow the contractor to use the existing overhead crane for the duration of the project. All questions shall be submitted via email To Garver and CC City by Thursday February 9, 2023. Questions shall be addressed to: 1. Garver: a. Danny Bauer: DJBauer@GarverUSA.com b. Alec Macmanus: ARMacmanus@garverusa.com c. Greg Swoboda: GTSwoboda@garverusa.com 2. City: a. Gerardo "Jerry" Garza: ggarza2@ci.laredo.tx.us b. Mike Rodgers: mrodgers@ci.laredo.tx.us c. Wicho Tijerina: jtijerina@ci.laredo.tx.us Contract time is 260 calendar days to substantial completion and 300 calendar days to final completion. Proposals submitted by telephone, telegraph, or fax, will not be considered. Bidders are expressly advised to review Section C-3.10 of the General Conditions of the proposed Contract as to the causes which may lead to the disqualification of a bidder and/or the rejection of a bid proposal. Unless all bids rejected, Owner agrees to give Notice of Award of Contract to the successful bidder within sixty (60) days from the date of the bid opening.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents