Last Updated | 03/02/2023 03:04 PM |
Project Title | EL Pico Water Treatment Plant High Service Pump Station Improvements |
Physical Address | View project details and contacts |
City, State (County) | Laredo, TX 78045 (Webb County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Sewage Treatment Plant, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $806,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | For the furnishing of all necessary materials, machinery, equipment, labor, superintendence, and all other services and appurtenances required for the El Pico WTP High Service Pump Station Improvements The scope of work shall include the demolition of three (3) existing pump control valves and adjacent piping and supports at the El Pico WTP High Service Pump Station. The scope also includes the installation of three (3) Owner-furnished check valves, three (3) Ownerfurnished magnetic flow meters, three (3) differential pressure transmitters, pressure gauges, piping, appurtenances, supports, and all incidental works as shown on the drawings and specifications. The contractor is responsible for integration of the flow meters and pressure transmitters into the existing PLC and SCADA system. Contractor shall provide all labor, machinery, materials & incidentals necessary to complete the project. The Utilities Department will allow the contractor to use the existing overhead crane for the duration of the project. All questions shall be submitted via email To Garver and CC City by Thursday February 9, 2023. Questions shall be addressed to: 1. Garver: a. Danny Bauer: DJBauer@GarverUSA.com b. Alec Macmanus: ARMacmanus@garverusa.com c. Greg Swoboda: GTSwoboda@garverusa.com 2. City: a. Gerardo "Jerry" Garza: ggarza2@ci.laredo.tx.us b. Mike Rodgers: mrodgers@ci.laredo.tx.us c. Wicho Tijerina: jtijerina@ci.laredo.tx.us Contract time is 260 calendar days to substantial completion and 300 calendar days to final completion. Proposals submitted by telephone, telegraph, or fax, will not be considered. Bidders are expressly advised to review Section C-3.10 of the General Conditions of the proposed Contract as to the causes which may lead to the disqualification of a bidder and/or the rejection of a bid proposal. Unless all bids rejected, Owner agrees to give Notice of Award of Contract to the successful bidder within sixty (60) days from the date of the bid opening. |
||||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |