Similar Projects
Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

Major Reconstruction-Ham-Ir 275-28.69
Infrastructure
Bidding
OH

Four Lane Resurfacing - HAM-IR 71-16.66
Infrastructure
Bidding

2020 Street Reconstruction, Resurfacing, Curb Removal and Replacement Project
Post-Bid
Fairfax, OH

Chester Road Repair and Resurfacing Project - Phase 1
Post-Bid
Woodlawn, OH 45215

Harrison Avenue Improvements
Results
North Bend, OH

Winton Road Improvements
Results
Greenhills, OH

Larchview Drive and Plainfield Road Improvements
Infrastructure
Bidding
$3,832,840 est. value
Cincinnati, Dillonvale, OH 45236

Vera, Elbrook and Vera Service Drive Improvement
Post-Bid
Golf Manor, OH

Delhi Township Rehabilitation and Repair Project
Results
Less than $885,423 est. value
Cincinnati, OH 45200

Sundale Avenue Improvements
Post-Bid
North College Hill, OH 45239

Anderson Township 2020 Curb Replacement
Results
Less than $1,500,000 est. value
Anderson, OH

Patterson and Central Avenue Rehabilitation
Post-Bid
Lockland, OH 45215

Colerain Road Program
Results
OH

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Post-Bid

Last Updated 08/09/2021 12:37 AM
Project Title

Major Reconstruction - HAM-74 - 18.01

Physical Address View project details and contacts
City, State (County) Cincinnati, OH 45203   (Hamilton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Describes the Statement of Qualifications (SOQ) requirements for the HAM 74 MCE Phase 5B Reconstruction (MCE-5B). The project is in the City of Cincinnati, Hamilton County, Ohio. MCE-5B was split off the Mill Creek Expressway (MCE) work originally to be completed under PID 83723. MCE-5B primarily reconfigures and improves the I-75SB connection to I-74WB with the construction of two new ramp bridges (Ramp O and Ramp R) over CSX/NS, Mill Creek, and Spring Grove Avenue. The Project will also make additional improvements to I-74WB between I-75 and Montana Ave including the reconstruction of I-74 westbound, bridge work on I-74, and the replacement of the pedestrian bridge over I-74.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents