Similar Projects
New Student Center
New Construction - 25,000 SF
Conception
$11,000,000 est. value
Shelby, NC 28152

Maco Addition
Addition, Infrastructure - 7,800 SF
Conception
$4,200,000 CJ est. value
Shelby, NC 28150

Intersection Realignment
Infrastructure
Design
$1,000,000 CJ est. value
Shelby, NC 28150

Intersection Realignment
Infrastructure
Design
$1,000,000 CJ est. value
Shelby, NC 28150

Kings Mountain Sewer Improvement
Infrastructure
Bidding
$300,000 CJ est. value
Kings Mountain, NC 28086

Fire Hydrant Replacement Project
Infrastructure
Bidding
$500,000 CJ est. value
Kings Mountain, NC 28086

RFQ Contractor - Cleveland County Justice Center Phase 2 (BP02B Sitework & Utilities)
Infrastructure
Sub-Bidding
$4,600,000 CJ est. value
Shelby, NC 28150

Swine Holding Facility -Cvm
New Construction
Post-Bid
$1,000,000 est. value

Jack Hunt Cooling Tower
Renovation
Post-Bid
$200,000 CJ est. value
Shelby, NC 28152

Grading, Drainage, Paving and Structure
Infrastructure
Results
NC

On-Call Patching, Paving and Milling
Infrastructure
Results

Cumberland Drive Stormwater Replacements
Infrastructure
Construction
$18,458 CJ est. value
Shelby, NC 28150

Cannon 35
New Construction, Infrastructure
Pending Verification
$275,000,000 CJ est. value
Kings Mountain, NC 28086

Cannon 35
New Construction, Infrastructure
Pending Verification
$275,000,000 CJ est. value
Kings Mountain, NC 28086

Cannon 35
New Construction, Infrastructure
Design
$275,000,000 CJ est. value
Kings Mountain, NC 28086

Last Updated 01/25/2023 12:38 PM
Project Title

Brinkley Amphitheater - Gardner Webb University

Physical Address View project details and contacts
City, State (County) Shelby, NC 28152   (Cleveland County)
Category(s) Education, Entertainment/Recreation, Heavy and Highway
Sub-Category(s) College/University, Paving/Reconstruction, Site Development, Stadium
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The first phase consists of the new construction of an amphitheater and courtyard. The next phase includes one building with retail space and a restaurant. Scope details have not been released. As of May 16, 2022 the project is in design stage. A building permit has not yet been issued by Cleveland County. The architect has been chosen. Information regarding the general contactor and method of selection has not been disclosed. The construction timeline has not been determined, but is not expected to begin before year end 2022.

Details

1 Story Above Grade, New Construction, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting and Coating, Painting, Special Coatings.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents