Similar Projects
Septic Access Cover Project
Infrastructure
Design
Houlton, ME 04730

Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements in the Towns of Ashland
Infrastructure
Bidding
$4,000,000 CJ est. value
Ashland, ME 04732

Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements in the Towns of Ashland
Infrastructure
Bidding
$4,000,000 CJ est. value
Ashland, ME 04732

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Statewide Geotechnical Drilling
Infrastructure
Results

Pavement Grooving and Polyurea Painting/Located on Interstate I95 and 95, various locations
Infrastructure
Results

1-GW King Pine Wind Generation Project
Infrastructure
Pending Verification
$2,000,000,000 CJ est. value
Portage Lake, ME 04768

Winter Road Maintenance for the West Side of Eagle Lake and Plaisted
Infrastructure
Post-Bid
Eagle Lake, ME

Crack Sealing/Priority 1
Infrastructure
Results
ME

2022 Paving
Infrastructure
Post-Bid
Presque Isle, ME

Harris Hill Road
Infrastructure
Results
Weston, ME 04424

2022 Chip Seal
Infrastructure
Post-Bid
Presque Isle, ME

Paving Old Main Street
Infrastructure
Results
Eagle Lake, ME 04739

Asphalt Street Paving
Infrastructure
Post-Bid
Houlton, ME

Last Updated 05/03/2023 03:13 PM
Project Title

Cyclical Pavement Resurfacing in the Towns of Merrill and Smyrna and Plantation of Moro - Region 5

Physical Address View project details and contacts
City, State (County) Merrill, ME 04780   (Aroostook County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,764,671 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The lowest responsive bidder must have completed, or successfully complete, a Highway Construction, Paving, or project specific prequalification to be considered for the award of this contract. Description: Maine Federal Aid Project No. 2731600, WIN 27316.00. Location: In Aroostock County, project is located on Route 212 beginning at US Route 2 in Smyma and extending Northwesterly 10.27 miles. Outline of Work: Cyclical Pavement Resurfacing, and other incidental work. For general information regarding Bidding and Contracting procedures, contact George Macdougall at (207) 624-3410. For Project-specific information fax all questions to George MacDougall at (207) 624-3431, use electronic RFI form or email questions to RFI-Contracts MDOT@maine.gov, project name and identification number should be in the subject line. Questions received after 12:00 noon of Monday (or if that Monday is a state holiday, Friday) prior to bid date will not be answered. Bidders shall not contact any other Departmental staff for clarification of Contract provisions, and the Department will not be responsible for any interpretations so obtained. TTY users call Maine Relay 711. Each Bid must be made upon dlank forms provided by the Department and must be accompanied by a bid bond at 5% of the bid amount or an official bank check, cashier's check, certified check, certificate of deposit, or United States postal money order in the amount of 5% of the bid amount, payable to Treasurer, State of Maine as a Bid guarantee, A Contract Performance Surety Bond and a Contract Payment Surety Bond, each in the amount of 100 percent of the Contract price, will be required of the successful Bidder. This Contract is subject to all applicable Federal Laws. This contract is subject to compliance with the Disadvantaged Business Enterprise program requirements as set forth by the Maine Department of Transportation. The right is hereby reserved to the MaineDOT to reject any or all bids. MEDOT - Cyclical Pavement Resurfacing - Merrill, Smyrna and Moro Plantation - Region 5 We now accept electronic bids for bid packages. Electronic bids do not have to be accompanied by paper bids. Please note: The Department will accept a facsimile of the bid bond; however, the original bid bond must then be received at the MDOT Contract Section within 72 hours of the bid opening. Until further notice, dual bids (one paper, one electronic) will be accepted, with the paper copy taking precedence.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents