Similar Projects
Water Reclamation Facility (WRF) Administration Building, Air Handling Unit Replacement
Alteration
Post-Bid
$4,000,000 est. value
Billings, MT 59101

Heating System Upgrades Phase 1
Alteration
Post-Bid
$270,000 est. value
Butte, MT 59701

HVAC Upgrades Donaldson Building
Renovation
Results
$1,488,580 CJ est. value
Helena, MT 59601

Columbus Schools ESSER projects
Alteration
Results
$294,000 est. value
Columbus, MT 59019

5 South Last Chance Gulch Boiler Upgrade Rebid
Renovation
Construction
$349,729 CJ est. value
Helena, MT 59601

Region 7 Headquarters Boiler Replacement
Renovation
Construction
$42,000 CJ est. value
Miles City, MT 59301

HVAC
Renovation
Post-Bid
$200,000 CJ est. value
Hysham, MT 59038

Brockmann HVAC Energy Upgrades
Renovation
Results
$1,978,840 CJ est. value
Havre, MT 59501

Boiler Replacement at Edgerton Elementary
Renovation
Post-Bid
$300,000 CJ est. value
Kalispell, MT 59901

Water Heater/Boiler Replacements
Renovation
Results
$127,570 CJ est. value
Billings, MT 59101

Libby Dam Heating Ventilation and Air Conditioning
Renovation
Post-Bid
$100,000 CJ est. value
Libby, MT 59923

Montana Wild Rehabilitation Ventilation
Renovation
Results
$80,954 CJ est. value
Helena, MT 59602

Babb Elementary School Boiler Replacement
Renovation
Post-Bid
$565,000 CJ est. value
Browning, MT 59417

Heating System Upgrades - Phase 2 MT Technological University
Renovation
Results
$2,179,183 CJ est. value
Butte, MT 59701

Boiler Plant Operations & Maintenance
Term Contract
Post-Bid
Hamilton, MT 59840

Last Updated 10/09/2023 11:37 AM
Project Title

Great Falls Public Schools Ventilation - Sunnyside Elementary School

Physical Address View project details and contacts
City, State (County) Great Falls, MT 59405   (Cascade County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Construction complete as of August 2023 , Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of renovation to the mechanical system and replacement and reconstruction of the existing window systems. All Bids must be on a lump sum basis; segregated Bids will not be accepted. Project construction to be started and completed prior to August 29, 2022. Project work can begin during the school year but must be coordinated with the District. All Bidders are encouraged to attend. Bids shall be submitted on the form provided with the Project Manual. The responsibility for obtaining enough information for Bidding purposes from the complete Contract Documents shall remain with the party requesting Documents. Addenda and Prior Approvals will be distributed Bid Security in the amount of ten percent (10%) of the Bid must accompany each Bid in accordance with the Instructions to Bidders. Project No.: GFPS21_VENT - SSIDE The Contractor shall comply with all fair labor practices and shall meet the requirements of Federal Davis Bacon Wage rates and Montana Gross Receipts Tax. A Bid Bond for ten percent (10%) of the bid and a Performance (10%) of the bid, and a Performance Bond for one hundred percent (100%) of the bid will be required. No Bidder may withdraw their Bid for at least thirty (30) days after the scheduled time for receipt of Bids except as noted in the Instruction to Bidders. The Project will be awarded to the lowest responsible bidder. Project consists of reconstruction of the existing window systems.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents