Similar Projects
P360 Performance Sports
Conception
Brandon, MS

Davis Elementary School Bathroom Renovations
Renovation
Conception
Greenwood, MS 38930

Long Beach High School Track Resurfacing
Renovation
Bidding
Long Beach, MS 39560

Construction of Walking Trail and Park at Madison County Nursing Home
New Construction
Bidding
Canton, MS 39046

Track Resurfacing - Oxford Middle
Post-Bid
Oxford, MS 38655

Cornerstone Park - Phase 3
Post-Bid
Starkville, MS

Pass Christian High School Baseball and Softball Field Batting Cages
New Construction
Results
$350,000 est. value
Pass Christian, MS 39571

Natchez Aquatic Center- Phase II Shower/ Locker Room Addition
Addition
Results
Natchez, MS 39120

Robinson Park Improvements
Construction
Clinton, MS

YMD Joint Water Management District
Renovation
Construction
Stoneville, MS 38776

Regents School Of Oxford
New Construction
Pending Verification
Oxford, MS

Southern Sports Institute (SPI) Oxford Commons
New Construction - 106,320 SF
Pending Verification
$10,000,000 CJ est. value
Oxford, MS 38655

McKee Park Renovations
Renovation
Conception
$4,700,000 est. value
Starkville, MS

Neshoba Central Softball and Baseball Facility
New Construction - 20,866 SF
Bidding
Philadelphia, MS

New Gymnasium for Martin Luther King Jr. Sports Complex
Post-Bid
McComb, MS 39648

Last Updated 01/14/2022 09:18 AM
Project Title

George Evans Park & Needmore Center Refurbishing

Physical Address View project details and contacts
City, State (County) Starkville, MS 39759   (Oktibbeha County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Park/Playground, Restroom/Bath House
Contracting Method Competitive Bids.
Project Status Master Planning
Bids Due View project details and contacts
Estimated Value $1,530,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The big change here is taking the Needmore Center, removing the existing facility and building a new 3,000 square-foot facility on the northwest corner of the property. Along with a new Needmore Center, the park would have new parking spaces, a 7,000 square-foot dog park, an iconic entry feature, a new restroom facility and a tree-lined sidewalk connection to Gillespie Street.

Details

10,000 SF - Park/Playground, 7,000 SF Renovation, Restroom/Bath House, Renovation, Athletic Facility, 3,000 SF New Construction.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Selective Clearing, Earth Moving, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents