Similar Projects
Parkside
New Construction
Conception
Tuscaloosa, AL

North Dean Mixed-Use
New Construction
Conception
Auburn, AL 36830

The Star Uptown / Carraway Hospital Redevelopment
Demolition, New Construction, Infrastructure, Renovation
Design
$300,000,000 CJ est. value
Birmingham, AL 35234

Godbold Building
New Construction - 54,400 SF
Design
Auburn, AL 36830

Remodeling Work for 106-B, 107-A, and 107-B Roberts Apartments
Build-out
Bidding
$300,000 CJ est. value
Athens, AL 35611

Remodeling Work for 100 Scotland Drive, 106 Scotland Drive, and Apartment 202, Sanderfer Road Apartments
Build-out
Bidding
$300,000 CJ est. value
Athens, AL 35611

Boardwalk at Research Park
New Construction - 320,943 SF
Post-Bid
$10,000,000 CJ est. value
Huntsville, AL 35806

Terraces at High Mountain
New Construction - 1,097,285 SF
Post-Bid
Huntsville, AL 35811

Camelia Court Renovations 2021
Renovation
Results
Greenville, AL 36037

Construction Repairs to (4) Casualty Apartments
New Construction
Results
Decatur, AL 35601

Mercantile on Morris a/k/a Founders Station-Phase II
Renovation - 14,000 SF
Construction
Birmingham, AL 35203

Eastwood f/k/a Gardendale
New Construction - 464,308 SF
Construction
$30,000,000 est. value
Gardendale, AL 35071

701-711 S Brundidge Street Residential
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Troy, AL 36081

Rivi Apartments
New Construction
Pending Verification
Foley, AL 36535

1922 2nd Avenue South
New Construction
Conception
$200,000,000 est. value
Birmingham, AL 35233

Last Updated 02/16/2023 03:40 PM
Project Title

Phil Campbell Renovations 2023

Physical Address View project details and contacts
City, State (County) Phil Campbell, AL 35581   (Franklin County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Competitive Bids
Project Status No longer Accepting Requests, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $30,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

For Phil Campbell Renovations 2023 The project shall consist of the interior renovation of the units located at The Underwood Circle and Stalcup Circle Apartment Units. Primarily the replacement of flooring at 42 Units and replacement of showers at 20 units. This opportunity will be provided on this day or will otherwise have to be schedule with the Housing Authority, prior to the bid date. The contract shall be awarded to the lowest responsible bidder in accordance with the rules, regulations and polices of the Phil Campbell Housing Authority, also referred to as the "Housing Authority", and the U.S. Department of Housing and Urban Development and State of Alabama Bid Laws. Only Contractors who are properly licensed in accordance with criteria established by the State Licensing Board for General Contractors under Provision of Title 34, Chapter 8, Code of Alabama, 1975, as amended, will be considered for bidding the work. All bidders shall show such evidence by clearly displaying current license number on the outside of the sealed envelope in which the proposal is delivered. And a Copy of the Bidders License must be included with their bid. Licensing required by local municipalities shall be obtained prior to the execution of the construction contract Bids must be submitted on proposal forms furnished by the Architect within the project manual or copies thereof. No bid may be withdrawn after scheduled closing for receipt of bids for a period of thirty (30) days. The Owner reserves the right to reject any or all bids and to waive informalities. Along with proposal forms, Bidders shall include all required documents as indicated in the Project Manuel. A certified check or Bid Bond payable to the Housing Authority in an amount not less than five percent (5%) of the amount of the bid, must accompany the bidder's proposal. Performance and statutory labor and material payment bonds will be required at the signing of the Contract and the costs of the bonds shall be included in the Contractors Proposal. Other required bidding documents can be identified by reviewing the project manual and specifications. Contractors are required to comply with the requirements of Section 3 for new employment, training, contracting opportunities found in Title 24, CFR 135. Construction Documents are anticipated to be released 3rd Party websites posting plans are not endorsed by the Architect, AND the Architect is unable to monitor, confirm and maintain websites that are beyond his control. All current information and Addendums shall be posted to a web share platform with the access link and notifications being distributed to those who have requested documents and provide their information to the Architect. The Architect retains ownership and copyrights of the documents in Accordance with Alabama Law. The Architect will not manage printing and shipping of construction documents. All Request for Information (RFI's) and Product Substitution Requests regarding the bid documents shall be sent and addressed thru the following e-mail account: jay@evansarchitecturaldesign.com. All email correspondence must be accompanied with the corresponding completed RFI or Substitution Form, found with-in the Project Manual. For a guaranteed response, all Inquires must be made no later than 2 business days prior to scheduled bid opening.

Details

Renovation, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents