Similar Projects
RWCC Water Storage Tank Replacement
Term Contract
Design

Steelton Tank Rehabilitation
Alteration
Bidding
New Martinsville, WV

Hinkle Mountain, Little Laurel Waterline Extensions and Existing System Renovation
Renovation, Infrastructure
Bidding
Richwood, WV 26261

Sterling Water Treatment Tanks or Equivalent
Infrastructure
Post-Bid
Green Bank, WV 24944

Mod Branch Reservoir Rehabilitation
Infrastructure
Post-Bid
Welch, WV

World-Wide Water Storage Tank Remediation
Term Contract
Results

World-Wide Water Storage Tank Remediation
Term Contract
Results

Water Storage Tank
Infrastructure
Post-Bid
$200,000 est. value
WV

Replace Product Recovery Tank
Results
$250,000 to $500,000 est. value
Martinsburg, WV 25405

LAST or LUST Corrective Action and Site Remediation
Infrastructure
Post-Bid
Charleston, WV

Cumberland Heights Water Storage Tank
Results
New Cumberland, WV

Yates Water Storage Tank - Contract 10A
Infrastructure
Post-Bid
Lewisburg, WV

Contract 2 - Water Tank Rehabilitation
Results
Cowen, WV

Ruffner Water Storage Tank - Contract 10B
Infrastructure
Post-Bid
Lewisburg, WV

Water System Improvements
Results
Less than $1,921,000 est. value
Augusta, WV 26704

Reported 03/30/2022 12:50 AM
Project Title

Developing the Tank Site

Physical Address View project details and contacts
City, State (County) Richwood, WV   (Nicholas County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To developing the tank site, providing and installing of a 100,000 gallon elevated potable water storage tank (approximately seventy (70) feet in height and twenty (20) to thirty (30) feet in diameter) it's foundation and all its appurtenances, constructing a gravel access road with drainage (approximately 1,250-feet in length) to the tank site, installation of approximately 1,175-feet of 8-inch PVC potable waterline from the proposed main to the proposed water storage tank, installation of chain link fencing and an access gate around the tank site, and installation of an underground electrical line to the tank site. Contract No. 4 - City of Richwood Water Treatment Plant Renovations Contract No. 4 will consist of partially renovating the existing City of Richwood Water Treatment Plant in Richwood, West Virginia; more specifically including but not limited to the following: removal and replacement of two (2) flocculator assemblies and two (2) flocculator drive motors, removal and replacement of two (2) tube settlers, removal and replacement of two (2) gravity filter underdrains, removal and replacement of two (2) gravity filter surface wash assemblies, removal and replacement of two (2) filters' mixed media in their entirety, removal and replacement of existing handrail within the treatment facility, removal of the existing finished water flow meter and installation of a new flow meter and flow meter vault, removal and replacement of three (3) existing high-service pump drives, removal and replacement of two (2) backwash pump drives, replacement of the existing water treatment plant main control panel, replacement of the existing actuated valves, installation of a new filter to waste drain line, modification of the existing backwash drain line(s), and sealant of cracks in concrete tank walls. Contract No. 5 - Existing Finished Water Storage Tank Renovations Contract No. 5 will consist of renovating an existing above ground 500,000 gallon welded steel potable water storage tank, most commonly known as the Lynn Street Tank, in Richwood, West Virginia; more specifically including but not limited to the following: clearing of vegetation around perimeter of tank at the site, installation of chain-link fencing around tank site, exterior paint removal lead abatement and re-painting, interior coating removal and lead testing and re-coating, replacing piping and valves in valve vault, replacing interior roof structure, safety improvements (replacing ladders, installing roof handrail, adding and replacing access hatches), roof vent replacement, tank overflow modifications, providing temporary potable water storage while the tank is being renovated, and ultimately testing and disinfecting the tank to place it back into service. Contract No. 6 - Radio Read Water Meters more specifically including but not limited to the following: removal of existing water meters, installation of new drive by radio read water meters to replace existing meters, modifying the meter box lids to install radio read antennas, providing and setting up drive by water meter radio reading equipment, training Owner on operation and maintenance of meters and reading equipment, and initial setup of reading equipment software/programming.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents