Similar Projects
Walton Drive - TOD 20-01 - City of Corinth
Infrastructure
Conception
$5,200,000 CJ est. value
Corinth, TX 76208

Parkridge Collector Road - ST 19-02 - City of Corinth
Infrastructure
Conception
$640,000 CJ est. value
Corinth, TX 76210

Velvet Taco / Frisco
New Construction, Infrastructure - 3,442 SF
Design
$1,000,000 CJ est. value
Frisco, TX 75033

Windsong Ranch Phases 7D & 7H
New Construction, Infrastructure - 185,000 SF
Design
Prosper, TX 76227

RFQ Construction Manager at Risk Services - Health Science Center
New Construction, Infrastructure - 175,000 SF
Bidding
$100,000,000 CJ est. value
Denton, TX 76209

Legacy Lift Station
New Construction, Infrastructure
Bidding
$20,000,000 CJ est. value
Frisco, TX 75034

Renovations to Four Middle Schools
Renovation
Post-Bid
$25,500,000 est. value
Carrollton, Dallas, Irving, TX 75007

Harvest Phase 10 Mass Grading
Post-Bid
TX

Harvest Phase 9 Mass Grading
Results
TX

Harvest Phase 16A and 16B Mass Grading
Infrastructure
Results
TX

Creekview & Ranchview MEPT & JROTC High School Renovations
Renovation
Construction
Carrollton, TX 75007

McMath Middle School Renovations Project
Renovation
Construction
Denton, TX 76205

Aloft / Lewisville
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Lewisville, TX 75067

Blalack Middle School Improvements
Renovation
Pending Verification
Carrollton, TX 75007

Shady Rest 12" Sewer Line Replace and upsize - WW 25-01 - City of Corinth
Infrastructure
Conception
$575,000 CJ est. value
Corinth, TX 76208

Last Updated 09/22/2022 06:16 PM
Project Title

RFQ Construction Manager at Risk - New Middle School 2

Physical Address View project details and contacts
City, State (County) Aubrey, TX 76227   (Denton County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Request for Qualifications, Construction start expected March 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $66,775,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

As of 9/22/2022, owner has determined the pre-qualified CMAR. 1. Steele & Freeman 2. Pogue 3. Core 4. Lee Lewis Pursuant to the provisions of the Texas Government Code, Chapter 2269, Subchapter F, itis the intention of the Aubrey Independent School District to select, via a Two-Step Method, Request for Qualifications, (RFQ) for Construction Manager at Risk for the projects described in the table in Section II. For the purposes of this document, 'Aubrey ISD' shall be referred to as "The Owner." The project(s) are described in the following table. This Request for Qualifications (RFQ) contains information and instructions to enable interested Proposers to prepare and submit a Qualifications Submittal and Cost Submittal (Step-2 Only) as well as information on the selection process. PRE-RESPONSE QUESTIONS. All questions regarding clarification or interpretation of the RFQ will be submitted in writing by the Proposer, and must be received by 2:00 P.M., August 5, 2022. No questions will be addressed unless provided in writing. The District, through Huckabee, will provide a response to questions to all Proposers who have received an RFQ directly from Huckabee. All correspondence pertaining to this RFQ should be addressed to: Luke Powell. AIA Huckabee & Associates, Inc. 801 Cherry Street, Suite 500 Fort Worth, Texas 76102 Email: luke.powell@huckabee-inc.com Fax: 817-377-2303 And Eric Hough Aubrey ISD 415 Tisdell Lane Aubrey, Texas 76227 Email: ehough@aubreyisd.net Fax: (940) 365-2627 construction commencement date - september 1, 2023. Substantial completed date - May 1, 2025

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents