Similar Projects
Peebles Pump Station and Force Main Project - General/Mechanical Construction
Bidding
$1,200,000 est. value
Allison Park, Pittsburgh, PA 15101

Pump Station 11 Upgrades Project
Bidding
Wilkes-Barre, PA 18702

Bunker Hill Water Pump Station
Post-Bid
Central City, PA 15926

WYE Lift Station Bar Screen Replacement
Post-Bid
Aliquippa, PA 15001

Pump Station Construction for the Water Booster Pump Station
Results
Mansfield, PA

Grinder Pump - General Construction
Results
West Middlesex, PA

Municipal Drive Pump Station And Force Main, General/Mechanical
Construction
$1,200,000 est. value
Downingtown, PA 19372

Kohler Tract Pumping Station - General Construction
Construction
$1,300,000 est. value
Emmaus, PA 18049

2021 Pump Station Installation Project (Alcoa, Milligantown, SR 780, Melwood)
Bidding
New Kensington, PA 15069

Clubhouse Outdoor Pool - Filter Room Mechanicals
Post-Bid
Blooming Grove, PA 18428

Long Term Control Plan Project 2018 Lift Station Improvements - General Construction
Results
Rochester, PA 15074

Construction of the Cupola Pump Station Replacement- General Construction
Construction
$750,000 to $1,000,000 est. value
Honey Brook, PA

General Construction - Connect to Municipal Sewer Phase II - Presque Isle State Park
Bidding
Less than $1,000,000 est. value
PA

Eastwood Pump Station Elimination Project
Post-Bid
North East, PA 16428

Springhill Farm WWTF Pump Station and Sanitary Force Main
Results
Chadds Ford, PA

Last Updated 04/23/2021 07:45 AM
Project Title

Primary Sludge Pumping Project - General Construction

Physical Address View project details and contacts
City, State (County) Hershey, PA 17033   (Dauphin County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 to $235,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the replacement of an existing primary sludge pump with a new owner provided pump and macerator, piping, valves, and associated electrical work.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents