Similar Projects
HVAC Services- DMV Norfolk-Widgeon Road CSC
Post-Bid
Chesapeake, Norfolk, VA 23513

HVAC and Mechanical Products
Term Contract
Post-Bid

Roof Top Air Handling Unit
Results
Chesapeake, VA 23323

HVAC System Replacement at the Landstown Transfer Station
Results
Chesapeake, VA 23320

Air Purification Systems
Post-Bid
Chatham, Pound, Victoria, VA 23936

HVAC Preventative Maintenance and Emergency Service
Term Contract
Results
Chesapeake, Norfolk, Portsmouth, Suffolk, Virginia Beach, VA

HVAC Maintenance and Repair
Post-Bid
Chesapeake, Portsmouth, VA 23322

Commercial HVAC Equipment and Technical Services
Results
$156,270 est. value
Chesapeake, VA

Armstrong SF665DW Heater Replacement Parts
Post-Bid

Packaged Rooftop Unit Replacement - Portlock Primary School
Results
Chesapeake, VA

Packaged Rooftop Unit Replacement - Hickory Middle School and Hugo A. Owens Middle School
Results
Chesapeake, VA 23322

Maintenance and Repair Services on HVAC Direct Digital Control Systems
Term Contract
Results
Chesapeake, Norfolk, Portsmouth, Suffolk, Virginia Beach, VA 23320

Cooling Tower Replacement - Indian River Middle School
Results
$118,370 est. value
Chesapeake, VA 23322

HVAC Replacement - Portlock Primary School Media Center
Results
Chesapeake, VA

Rooftop Unit, RTVAV-8 HVAC Replacement - Greenbrier Middle School
Results
Chesapeake, VA

Last Updated 02/06/2020 03:10 PM
Project Title

Packaged Rooftop Unit Replacement - Edwards-Wilson Center

Physical Address View project details and contacts
City, State (County) Chesapeake, VA 23324   (Chesapeake City County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor, materials, equipment, and incidentals necessary to remove and replace the existing packaged rooftop units with Owner furnished units for various rooms at Edwards-Wilson Center. 1. Remove existing gas fired rooftop units. Disconnect all electrical service feeding each RTU lockout/tagout breakers within panels. Disconnect all fire alarm wiring as required. Disconnect exiting DDC wiring from units. Contractor shall dispose of existing units. 2. Disconnect existing gas piping from units. 3. Disconnect ductwork from units as required. 4. Remove all condensate piping from each unit. 5. Prep existing roof curbs to accept new curb adapters.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents