Similar Projects
Mcneil Road Milling, Sealing and Overlay
Infrastructure
Bidding
$1,094 est. value
TX

2021-2022 TOC Pavement Preservation Package 7 Base Repair
Infrastructure
Bidding
$1,500,000 est. value
San Antonio, TX

Paving and Markings Services
Term Contract
Post-Bid
Lufkin, TX 75902

Wolf Ranch West Section 1AG 1BG
Post-Bid
TX

Street Resurfacing Project on Work Zone S15
Results
$1,559,189 est. value
Abilene, TX 79600

Base,Grade,ACP,Pav Mark
Results
Less than $2,569,764 est. value
TX

2021-2022 TOC for Flatwork and Street Improvement Package 5
Infrastructure
Bidding
$990,000 est. value
San Antonio, TX

Hot Mix Asphaltic Concrete Pavement (HMAC) and Hauling Precinct 3 and Precinct 4
Term Contract
Post-Bid
Hempstead, TX

Perry Avenue Road Extension
Results
Mont Belvieu, TX 77523

Old Chappell Hill Road Improvements
Post-Bid
$773,000 est. value
Brenham, TX 77833

MFR Water Treatment Plant Roadway Rehabilitation and Extension
Results
Less than $195,375 est. value
Harlingen, TX 78550

Annual Concrete Street Repair 2020-2021
Term Contract
Post-Bid
Heath, TX

Park Village Units 6, 8 & 9 - Paving, Sanitary Sewer, and Drainage
Results
San Antonio, TX 78231

Road Rehabilitation Project - 2020 Road Bond
Results
Woodville, TX 75979

Intersection Operational Improvements
Results
Less than $3,174,166 est. value
TX

Last Updated 07/02/2021 04:57 AM
Project Title

FM 725 - Widen Road - Add Shoulders

Physical Address View project details and contacts
City, State (County) TX   (Guadalupe County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $12,953,967
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

100 6002 Preparing Row Sta 313.000 1 104 6017 Removing Conc (Driveways) Sy 837.000 2 110 6001 Excavation (Roadway) Cy 30,749.000 3 132 6005 Embankment (Final)(Ord Comp)(Ty C) Cy 14,406.000 4 161 6017 Compost Manuf Topsoil (4") Sy 73,263.000 5 164 6035 Drill Seeding (Perm) (Rural) (Clay) Sy 73,263.000 6 164 6051 Drill Seed (Temp)(Warm Or Cool) Sy 73,263.000 7 168 6001 Vegetative Watering Mg 1,145.000 8 169 6002 Soil Retention Blankets (Cl 1) (Ty B) Sy 73,263.000 9 216 6001 Proof Rolling Hr 54.000 10 247 6475 Fl Bs (Cip)(Ty D Gr 1-2, Or 5)Final Pos Cy 25,021.000 11 310 6027 Prime Coat(Mc-30 Or Ae-P) Gal 22,531.000 12 351 6001 Flexible Pavement Structure Repair(5") Sy 30,561.000 13 351 6002 Flexible Pavement Structure Repair(6") Sy 18,439.000 14 351 6013 Flexible Pavement Structure Repair(4") Sy 768.000 15 351 6019 Flexible Pavement Structure Repair(3") Sy 18,423.000 16 354 6021 Plane Asph Conc Pav(0" To 2") Sy 17,500.000 17 400 6005 Cem Stabil Bkfl Cy 245.000 18 400 6006 Cut & Restoring Pav Sy 135.000 19 432 6001 Riprap (Conc)(4 In) Cy 312.000 20 432 6045 Riprap (Mow Strip)(4 In) Cy 152.000 21 450 6006 Rail (Ty T223) Lf 192.000 22 459 6007 Gabion Mattresses (Galv)(12 In) Sy 333.000 23 459 6009 Gabions (3' X 3')(Galv) Cy 47.000 24 460 6004 Cmp (Gal Stl 30 In) Lf 13.000 25 460 6011 Cmp Ar (Gal Stl Des 4) Lf 29.000 26 460 6024 Cmp Ar (Gal Stl Des 7) Lf 93.000 27 462 6051 Conc Box Culv (5 Ft X 3 Ft)(Extend) Lf 80.000 28 462 6075 Conc Box Culv (10 Ft X 7 Ft)(Extend) Lf 180.000 29 464 6003 Rc Pipe (Cl Iii)(18 In) Lf 934.000 30 464 6030 Rc Pipe (Arch)(Cl Iii)(Des 1) Lf 813.000 31 464 6033 Rc Pipe (Arch)(Cl Iii)(Des 4) Lf 184.000 32 464 6034 Rc Pipe (Arch)(Cl Iii)(Des 5) Lf 22.000 33 465 6128 Inlet (Compl)(Psl)(Fg)(4ftx4ft-4ftx4ft) Ea 1.000 34 466 6111 Headwall (Ch - Pw - A - 0) (Des= 4) Ea 4.000 35 466 6114 Headwall (Ch - Pw - A - 0) (Des= 7) Ea 2.000 36 466 6156 Wingwall (Fw - 0) (Hw=9 Ft) Ea 2.000 37 466 6180 Wingwall (Pw - 1) (Hw=5 Ft) Ea 1.000 38 466 6181 Wingwall (Pw - 1) (Hw=6 Ft) Ea 1.000 39 466 6233 Headwall (Ch-Pw-0)(Dia = 30 In)(Mod) Ea 1.000 40 466 6260 Headwall (Ch-Pw-A-0)(Des 4) (Mod) Ea 1.000 41 467 6359 Set (Ty Ii) (18 In) (Rcp) (4: 1) (P) Ea 62.000 42 467 6517 Set (Ty Ii) (Des 1) (Rcp) (4: 1) (P) Ea 54.000 43 467 6553 Set (Ty Ii) (Des 4) (Rcp) (4: 1) (C) Ea 1.000 44 467 6561 Set (Ty Ii) (Des 5) (Rcp) (4: 1) (C) Ea 2.000 45 480 6001 Clean Exist Culverts Ea 8.000 46 496 6002 Remov Str (Inlet) Ea 1.000 47 496 6005 Remov Str (Wingwall) Ea 4.000 48 496 6006 Remov Str (Headwall) Ea 11.000 49 500 6001 Mobilization Ls 1.000 50 502 6001 Barricades, Signs And Traffic Handling Mo 25.000 51 506 6002 Rock Filter Dams (Install) (Ty 2) Lf 345.000 52 506 6011 Rock Filter Dams (Remove) Lf 345.000 53 506 6021 Construction Exits (Install) (Ty 2) Sy 3,828.000 54 506 6024 Construction Exits (Remove) Sy 3,828.000 55 506 6038 Temp Sedmt Cont Fence (Install) Lf 35,783.000 56 506 6039 Temp Sedmt Cont Fence (Remove) Lf 35,783.000 57 506 6041 Biodeg Erosn Cont Logs (Instl) (12") Lf 1,455.000 58 506 6043 Biodeg Erosn Cont Logs (Remove) Lf 1,455.000 59 512 6009 Port Ctb (Fur & Inst)(Low Prof)(Ty 1) Lf 420.000 60 512 6010 Port Ctb (Fur & Inst)(Low Prof)(Ty 2) Lf 80.000 61 512 6033 Port Ctb (Move)(Low Prof)(Ty 1) Lf 1,000.000 62 512 6034 Port Ctb (Move)(Low Prof)(Ty 2) Lf 280.000 63 512 6057 Port Ctb (Remove)(Low Prof)(Ty 1) Lf 420.000 64 512 6058 Port Ctb (Remove)(Low Prof)(Ty 2) Lf 80.000 65 530 6004 Driveways (Conc) Sy 855.000 66 530 6019 Driveways (Acp)(Type 1) Sy 6,227.000 67 530 6021 Driveways (Acp) (Type 2) Sy 8,170.000 68 540 6001 Mtl W-Beam Gd Fen (Tim Post) Lf 2,214.000 69 540 6002 Mtl W-Beam Gd Fen (Steel Post) Lf 50.000 70 540 6006 Mtl Beam Gd Fen Trans (Thrie-Beam) Ea 4.000 71 540 6016 Downstream Anchor Terminal Section Ea 11.000 72 540 6033 Mtl Bm Gd Fen (Long Span System) Ea 2.000 73 542 6001 Remove Metal Beam Guard Fence Lf 1,930.000 74 542 6002 Remove Terminal Anchor Section Ea 4.000 75 544 6001 Guardrail End Treatment (Install) Ea 13.000 76 544 6003 Guardrail End Treatment (Remove) Ea 12.000 77 560 6001 Mailbox Install-S (Twg-Post) Ty 1 Ea 57.000 78 560 6002 Mailbox Install-D (Twg-Post) Ty 1 Ea 18.000 79 560 6003 Mailbox Install-M (Twg-Post) Ty 1 Ea 14.000 80 644 6001 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(P) Ea 111.000 81 644 6004 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(T) Ea 38.000 82 644 6007 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(U) Ea 4.000 83 644 6030 In Sm Rd Sn Sup&Am Tys80(1)Sa(T) Ea 4.000 84 644 6033 In Sm Rd Sn Sup&Am Tys80(1)Sa(U) Ea 4.000 85 644 6036 In Sm Rd Sn Sup&Am Tys80(1)Sa(U-Bm) Ea 2.000 86 644 6064 In Bridge Mnt Clearance Sgn Assm(Ty N) Ea 2.000 87 644 6076 Remove Sm Rd Sn Sup&Am Ea 106.000 88 658 6060 Remove Delin & Object Marker Assms Ea 55.000 89 658 6062 Instl Del Assm (D-Sw)Sz 1(Brf)Gf2(Bi) Ea 46.000 90 658 6099 Instl Om Assm (Om-2z)(Wflx)Gnd Ea 152.000 91 662 6063 Wk Zn Pav Mrk Remov (W)4"(Sld) Lf 155,246.000 92 662 6093 Wk Zn Pav Mrk Remov (Y)4"(Brk) Lf 16,428.000 93 662 6095 Wk Zn Pav Mrk Remov (Y)4"(Sld) Lf 107,219.000 94 662 6109 Wk Zn Pav Mrk Sht Term (Tab)Ty W Ea 3,052.000 95 662 6111 Wk Zn Pav Mrk Sht Term (Tab)Ty Y-2 Ea 1,526.000 96 666 6048 Refl Pav Mrk Ty I (W)24"(Sld)(100mil) Lf 770.000 97 666 6078 Refl Pav Mrk Ty I (W)(Word)(100mil) Ea 10.000 98 666 6156 Refl Pav Mrk Ty I(Y)(Med Nose)(100mil) Ea 2.000 99 666 6224 Pavement Sealer 4" Lf 71,955.000 100 666 6225 Pavement Sealer 6" Lf 60,275.000 101 666 6230 Pavement Sealer 24" Lf 770.000 102 666 6232 Pavement Sealer (Word) Ea 10.000 103 666 6233 Pavement Sealer (Med Nose) Ea 2.000 104 666 6312 Re Pm W/Ret Req Ty I (Y)4"(Brk)(100mil) Lf 8,750.000 105 666 6315 Re Pm W/Ret Req Ty I (Y)4"(Sld)(100mil) Lf 61,081.000 106 666 6343 Ref Prof Pav Mrk Ty I(W)6"(Sld)(100mil) Lf 60,275.000 107 666 6345 Ref Prof Pav Mrk Ty I(Y)4"(Sld)(100mil) Lf 2,118.000 108 672 6007 Refl Pav Mrkr Ty I-C Ea 117.000 109 672 6009 Refl Pav Mrkr Ty Ii-A-A Ea 975.000 110 730 6107 Full - Width Mowing Cyc 9.000 111 734 6002 Litter Removal Cyc 25.000 112 738 6003 Cleaning / Sweeping (Outside Main Lane) Cyc 25.000 113 3076 6001 D-Gr Hma Ty-B Pg64-22 Ton 20,665.000 114 3076 6043 D-Gr Hma Ty-D Pg70-22 (Level-Up) Ton 33.000 115 3077 6023 Sp Mixes Sp-C Sac-B Pg70-22 Ton 24,601.000 116 3085 6001 Underseal Course Gal 34,396.000 117 5001 6002 Geogrid Base Reinforcement (Ty Ii) Sy 90,033.000 118 6001 6002 Portable Changeable Message Sign Ea 3.000 119 6185 6002 Tma (Stationary) Day 459.000 120 6185 6005 Tma (Mobile Operation) Day 63.000 121

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents