Similar Projects
Cesar Batalla ES Chiller Replacement
Renovation
Sub-Bidding
$200,000 CJ est. value
Bridgeport, CT 06605

Boiler Replacement at Fox Run Elementary School and Ventilation System Upgrade in Boys` and Girls` Locker Rooms at Brien McMahon High School
Alteration
Post-Bid
Norwalk, CT 06854

Replacement and Upgrade of the HVAC Controls for the Sherman School
Alteration
Post-Bid
Sherman, CT 06784

Brien Mcmahon High School - Pipe Tunnel Ventilation and Unit Ventilator Renovations
Results
$75,000 est. value
Norwalk, CT 06854

Riverside Elementary School Multi Room HVAC Upgrade
Results
Greenwich, CT 06878

Frenchtown Elementary School Cooling Towers Replacement
Alteration
Post-Bid
Trumbull, CT 06611

Heating Plant Upgrades at Rippowam Middle School
Results
Stamford, CT 06905

Residential Weatherization
Term Contract, Alteration
Post-Bid
Bridgeport, CT

Heating and Ventilation Upgrade Project
Alteration
Results
Weston, CT

On-Call HVAC Building Automation and Mechanical Service and Design
Alteration
Post-Bid
Stamford, CT

Replacement of Two Rooftop Air Conditioning and Ventilation Units at Bethel High
Alteration
Results
Bethel, CT

HVAC Upgrade at North Street School
Alteration
Post-Bid
Greenwich, CT 06830

New HVAC at the Glenbrook Fire Department
Alteration
Results
Stamford, CT 06906

On Call Services - All Trades - Citywide
Term Contract
Post-Bid
Bridgeport, CT

Jettie S. Tisdale Chiller Replacement
Alteration
Results
$1,000,000 est. value
Bridgeport, CT 06607

Last Updated 11/16/2022 03:34 PM
Project Title

Installation of the New Air Conditioning System at Wormser Congregate

Physical Address View project details and contacts
City, State (County) Stamford, CT 06905   (Fairfield County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project is federally assisted, therefore, bidders are to comply with the Section 3, Compliance HUD Act of 1968; labor Standards Provision of the Davis-Bacon Act; Contract Work Hours Standards Act; and Prevailing Wage determinations as issued by the United States Department of Labor. To receive consideration, bids must be in the hands of the authorized representative no later than the day and hour mentioned above. No bids shall be withdrawn for a period of sixty (60) days after the opening of bids, without the consent of the Owner. Charter Oak Communities reserves the right to accept or reject any or all bids; to waive any informality, or; to accept any bid deemed in the best interest of the Owner. CHARTER OAK COMMUNITIES Natalie Coard, Executive Director Bids will be received for furnishing all labor, materials, tools, services and equipment necessary to complete the Installation of the New Air Conditioning System at Wormser Congregate, 28 Vine Rd, Stamford, CT 06905.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents