Similar Projects
Water Treatment Plant Rooftop Unit Replacements
Bidding
Bloomington, MN

Itasca State Park Shop Boilers Replacement
Bidding
$95,000 est. value
Park Rapids, MN 56470

HVAC Filters
Term Contract
Post-Bid
Anoka, MN 55303

MBC - Alerton Controls Services
Term Contract
Post-Bid
Minneapolis, MN

HVAC System Replacement
Results
Grand Rapids, MN 55744

HVAC Upgrades
Results
Minneapolis, MN 55411

Multiple Site Furnace Unit Replacement
Bidding
Mapleton, MN 56065

Filter Replacement Services at PHA Properties
Post-Bid
Saint Paul, MN

Crooked Lake ES HVAC Replacement and Deferred Maintenance Phase 2
Results
Andover, MN 55304

Boiler Non Return Valve and Install
Renovation
Bidding
Faribault, MN 55021

F108--Chemo Hood Vent Decontamination and Disposal St. Cloud
Post-Bid
Saint Cloud, MN

Johnson High School HVAC Replacement
Results
Saint Paul, MN 55106

Boiler Burner Replacement and Cooling Tower Recondition
Bidding
$300,000 est. value
Anoka, MN 55303

Natatorium HVAC
Post-Bid
Rochester, MN

Franklin Elementary School HVAC Improvements 2020
Results
Mankato, MN 56001

Reported 04/18/2021 12:00 AM
Project Title

Replacement of 3 Compressors STA Duluth

Physical Address View project details and contacts
City, State (County) Duluth, MN 55802   (Saint Louis County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replace three compressors at STA DULUTH: Contractor shall furnish trained, qualified personnel and any required special tools or equipment necessary to complete any work task which may be issued. Work shall be completed within three weeks of award. Work tasks include: - Remove all three current compressors (Rietschle model DLR 250) - Directly replace three compressors with premium efficiency NEMA motor. - Compressor must produce same capacity as existing system components: 166 cfm at 23.2 PSI. - All existing piping, wiring and mounting plates must be utilized. No new piping/wiring/plating should need to be added.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents