Similar Projects
Airport Site Development
Infrastructure
Conception
Gulfport, MS

AAA Self Storage Addition
New Construction, Infrastructure
Design
$500,000 CJ est. value
Biloxi, MS 39531

RFQ Contractor - Biloxi Building 1
Addition, Demolition, Renovation, Infrastructure
Bidding
$50,000,000 CJ est. value
Biloxi, MS 39531

Letort Lane Drainage Improvements
Infrastructure
Bidding
$2,250,000 CJ est. value
Biloxi, MS 39532

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Repair and Maintenance Unit Price Project
Infrastructure
Post-Bid
Gulfport, MS

Long Beach Wastewater System Upgrade Phase 1
Results
Gulfport, MS

Cotton Compress Site Improvements
Infrastructure
Results
$1,095,732 est. value
Gulfport, MS

Jiffy Lube / D'iberville
New Construction, Infrastructure - 3,438 SF
Construction
$1,500,000 CJ est. value
Diberville, MS 39540

Gulfport Town Center
New Construction, Infrastructure - 40,000 SF
Pending Verification
$50,000,000 CJ est. value
Gulfport, MS 39501

Harrison Central High School Baseball Field Improvements
Infrastructure
Bidding
$100,000 CJ est. value
Gulfport, MS 39503

F103--Potable Water Analytic System
Term Contract
Post-Bid
Biloxi, MS

Area 4 Beauvoir Phase 1, 2 and 3 BEA1, BEA2 and BEA3
Infrastructure
Results
$20,000,000 to $25,000,000 est. value
Biloxi, MS

2nd Street Sidewalk Extension
Infrastructure
Bidding
$220,000 CJ est. value
Long Beach, MS 39560

CTA Tram, Bike & Pedestrian Bridge
Infrastructure
Post-Bid
$200,000 CJ est. value
Gulfport, MS 39501

Last Updated 10/12/2022 04:35 AM
Project Title

Rehabilitate Airfield Drainage Phase 2B FAA Airport Improvement Program Project

Physical Address View project details and contacts
City, State (County) Gulfport, MS 39503   (Harrison County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The construction cost estimate range for this project is $1.3M - $1.5M (Base Bid + all Additive Alternates). Bidders are asked to coordinate with Airport Operations (228-863-1908) prior to submitting paper bids. Bidders may also call into 1-877-431-8639 (PIN 982-713-9178) at 2:00 PM to hear results of bid opening. The work is generally described as follows: This project is to rehabilitate airfield drainage at the Gulfport-Biloxi International Airport by removing and replacing approximately 2,525 LF of RCP ranging in sizes from 18" to 60", removing and replacing 12 drainage structures, site grading, flow fill, additional RCP/structure removal, and other miscellaneous drainage work. The contract time for the base bid and additive alternates is 120 consecutive calendar days. Liquidated damages in the amount of $500.00 per calendar day will be assessed for each calendar day thereafter, and $1,000.00 per 15-minute interval of runway closure past scheduled opening. It is strongly recommended that prospective bidders attend the pre-bid conference. All site visits by any persons shall be conducted on the morning of March 10th, 2022 immediately following the pre-bid conference; meeting location will be coordinated during the pre-bid conference. Any questions that bidders might have should be directed to the following: Neel-Schaffer, Inc., 772 Howard Avenue, Biloxi, MS 39530 to the attention of Alex Davis or via email at alex.davis@neel-schaffer.com. All proposals that are mailed shall be sent to the Airport's Executive Director at the address below. Clay Williams, Executive Director Gulfport-Biloxi International Airport 14035-L Airport Road Gulfport, Mississippi 39503 228-863-5951 Bidders must be qualified under Mississippi Law and show a current Certificate of Responsibility issued by the Mississippi Board of Public Contractors establishing classification as to the value and type of construction work on which he is authorized to bid. ALL BIDDERS must be properly licensed contractors at the time of submitting bids in accordance with the provisions of the State of Mississippi. Contractors submitting a written sealed bid must indicate their current Mississippi Certificate of Responsibility number on the outside of the sealed envelope containing their Bid as well as on their Bid. If the Bid is being submitted electronically through the Online Plan Room, the Mississippi Certificate of Responsibility number must be included as an attachment with the electronic bid submittal as well as on their Bid. To be considered, a bid for Rehabilitate Airfield Drainage, Phase 2B must be either sealed, and have clearly written on the face of the envelope the following: "Sealed bid enclosed for Gulfport-Biloxi Regional Airport Authority Rehabilitate Airfield Drainage, Phase 2B to be opened 2:00 PM, March 22nd, 2022." or if submitted electronically through the Online Plan Room, the first page of an electronically submitted bid must state the same language as required on the face of the sealed envelope. Bidder's attention is invited to the Instructions to Bidders relative to pre-award, equal employment opportunity requirements, and non-segregated facilities. Bids must be submitted on the standard form of bid proposal and must include a Bid Bond in the amount of 5% of the Bid. The successful bidder will be required to execute the standard form of Contract and Agreement, together with a 100% Performance Bond and a 100% Payment Bond, within 10 days after formal award of the contract. If the bid is being submitted electronically, originals of the bid bond, signed or countersigned by a Mississippi Resident Agent, with Power of Attorney attached, a cashier's check or certified check for five (5%) percent of bid, payable to the Owner must be delivered to the Gulfport-Biloxi Regional Airport Authority within forty-eight (48) hours of the bid opening time and date. The bidder shall guarantee to hold his bid good and may not withdraw his bid for a period of 90 calendar days after the scheduled closing time for receiving bids. This project is subject to the requirements of the Davis-Bacon Act, as amended. The Contractor is required to comply with wage and labor provisions and to pay minimum wages in accordance with the schedule of wage rates established by the United States Department of Labor. The attention of bidders is directed to the Contract Provisions governing selection and employment of labor. Minimum wage rates have been predetermined by the Secretary of Labor and are subject to Public Law 87- 58-1, Work Hours Act of 1962, as set forth in the Contract Provisions. This project is subject to the requirements of 49 CFR Part 26 Disadvantaged Business Enterprise Participation. The Owner hereby notifies all bidders that it will affirmatively ensure that in any contract entered pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, religion or national origin in consideration for an award. The award of this contract will be contingent upon the Contractor satisfying the DBE requirements. The DBE participation goal for this contract is 12.06%. The bidder (proposer) will be required to submit information concerning the DBE's that will participate in this contract (subcontract). The information will include the name and address of each DBE, a description of the work to be performed by each named firm, and the dollar value of the contract (subcontract). If the bidder fails to achieve the contract goal as stated herein, the bidder must include documentation demonstrating that it made good faith efforts in attempting to do so. A bid that fails to meet these requirements will be considered non-responsive. The Gulfport-Biloxi Regional Airport Authority in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Award of contract is also subject to certain Federal provisions, including, but not limited to, the following: Title 49 United States Code, 49 U.S.C. Section 50101-Buy American Preferences; DOT Regulation 49 CFR Part 30-Foreign Trade Restriction; DOL Regulation 29 CFR Part 5-Davis Bacon Act; Executive Order 11246 and DOL Regulation 41 CFR Part 60-Affirmative Action Regulation 2 CFR 180-Government Wide Debarment and Suspension; and Title 41 United States Code, 41 U.S.C. section 8102-Drug Free Workplace 49 CFR Part 26, Disadvantaged Business Enterprise Participation The award, if made, will be made to the party submitting the bid deemed most favorable to Gulfport-Biloxi Regional Airport Authority at the time the conditions are stipulated. The Gulfport-Biloxi Regional Airport Authority reserves the right to reject any and all bids and to waive any informalities or irregularities in the bids received. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bidders may also call into 1-877-431-8639 (PIN 982-713-9178) at 2:00 PM to hear results of bid opening

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents