Similar Projects
I-59 Widening
Infrastructure
Conception
Less than $50,000,000 est. value
Trussville, AL 35173

Murphy USA #7171/7856 / Russellville
Demolition, New Construction, Infrastructure
Conception
$1,500,000 CJ est. value
Russellville, AL 35653

Lift Station 8 Improvements
Renovation, Infrastructure
Design
$300,000 CJ est. value
Guntersville, AL 35976

Fire Station #10 Construction - City of Dothan
New Construction, Infrastructure
Design
$5,500,000 CJ est. value
Dothan, AL 36301

Autauga County EMA Storage Building
New Construction, Infrastructure - 2,732 SF
Bidding
$150,000 CJ est. value
Prattville, AL 36066

Natural Gas Facilities Replacement
Infrastructure
Bidding
$458,185 CJ est. value
Graysville, AL 35073

Rehabilitation of the Asphalt Surfaces of Various Streets- Phase 2
Post-Bid
Demopolis, AL

2021 Street Resurfacing
Infrastructure
Post-Bid
Citronelle, AL

MA-ALDOT Strip Patching Alex City Area
Results

MA-ALDOT Strip Patching Alex City Area
Results

Rocket Development Phase 3
New Construction, Infrastructure - 40,000 SF
Pending Verification
$23,000,000 CJ est. value
Huntsville, AL 35801

Jail Well Pump Replacement
Infrastructure
Bidding
$310,000 CJ est. value
Citronelle, AL 36522

Periodic Bid for Various Construction Projects - 2021
Term Contract
Post-Bid
Huntsville, AL

Constructing the Resurfacing (Micro-Surfacing Seal Coat) and Traffic Stripe
Results
$398,472 to $487,021 est. value
Double Springs, AL

2022 TAP Sidewalk Projects
Infrastructure
Bidding
$500,000 CJ est. value
Muscle Shoals, AL 35661

Last Updated 08/17/2022 06:34 AM
Project Title

Sidewalk Improvements Along Marie Foster Street

Physical Address View project details and contacts
City, State (County) Selma, AL 36703   (Dallas County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $715,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For constructing the following: sidewalk improvements along marie foster street. The bracket estimate on this project is from $690,000 to $715,000 this bracket range is shown only to provide general financial information to contractors and bonding companies concerning the project's complexity and size. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This bracket should not be used in preparing a bid, nor will this bracket have any bearing on the decision to award the contract. The principal items of work are approximately as follows: 3020 sy concrete sidewalk, 4" thick 959 sy concrete driveway, 6" thick the entire project shall be completed in 75 working days. To be eligible for consideration, bids must be submitted on complete original proposals made available by the owner. Bid documents (including plans and proposals) are available through the digital plan room at alabama graphics, algraphicsplanroom.com. Bid documents are on file at selma city hall, selma, alabama. No bid documents will be distributed later than 24 hours prior to the scheduled opening of bids. A cashier's check (drawn on an alabama bank) or bid bond for 5% of the amount bid (maximum of $50,000.00) and made payable to the city of selma must accompany each bid as evidence of good faith. It is not required that a contractor be licensed in order to submit a bid; however, prior to award of a contract, proper proof of all applicable licensures must be provided by the contractor. Proof of insurance coverages of the types and amounts as set forth in the project specifications will be required of the contractor, and any and all subcontractors, prior to beginning work. The contractor will be required to perform work amounting to at least 30% of the total contract cost with his own organization. Contractor prequalification is not required to bid on this project. However, the award of the contract will not be made to any bidder who, at the time of the award, is considered by the alabama department of transportation (aldot) to be disqualified from bidding, nor to any bidder who is an affiliate of or has a corporate officer, director, or principal owner who is a corporate officer, director, or owner of, another person who is presently disqualified by aldot. Further details and definitions regarding this provision are included in section 102 of special provision 18-lpa3. This is a federally funded project through aldot. The proposed work shall be performed in conformity with the rules and regulations for carrying out the federal highway act and other acts amendatory, supplementary, or relative thereto. This project is subject to the contract work hours and safety standards act and its implementing regulations. Mbe/dbe participation is encouraged; however, no specific mbe/dbe goals have been established for this project. Minimum wage rates for this project have been pre-determined by the secretary of labor and are set forth in the advertised specifications. In accordance with title vi of the civil rights act of 1964, 78 stat. 252, 42 u.s.c. 2000d to 2000d-4 and title 49, code of federal regulations, department of transportation, subtitle a, office of the secretary, part 21, nondiscrimination in federally-assisted programs of the department of transportation issued pursuant to such act, all bidders are hereby notified that it will be affirmatively ensured that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, sex, or national origin in consideration for an award. The right to reject any or all bids and to disregard and minor irregularities is reserved.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents