Similar Projects
Wales Public Safety Building
Design
Wales, UT 84647

New Construction of Fire Station 62
New Construction
Post-Bid
Less than $6,000,000 est. value
Spanish Fork, UT

Moab BLM Fire Station
- 7,067 SF
Post-Bid
Moab, UT

Fire Training Center
Results
Less than $1,437,236 est. value
Salt Lake City, UT 84104

Santa Clara-Ivins Rachel Fire Station A and R
Results
Santa Clara, UT

Construction Manager as Constructor Services Saratoga Springs Police and Court Building
New Construction - 26,000 SF
Construction
Less than $8,000,000 est. value
Saratoga Springs, UT

Murray City Fire Station 18 Construction Services
Construction
Murray, UT

Remodel of Ogden City Fire Station 4
Renovation
Post-Bid
Ogden, UT 84401

Moab Wildfire Station
New Construction - 5,000 SF
Results
$1,500,000 to $3,000,000 est. value
Moab, UT 84532

Lehi City Police Station - Construction Management / General Contractor Services
New Construction - 43,800 SF
Construction
Less than $13,500,000 est. value
Lehi, UT

South Davis Metro Fire Station 84 Facility and Parking Upgrade
Post-Bid
Bountiful, UT 84010

Airport Fire Stations 11 and 12 Roof Replacement/Solar Panels
Results
Salt Lake City, UT 84122

Construction Manager/General Contractor Services - Police and Fire Station 64
New Construction - 35,000 SF
Construction
Less than $11,200,000 est. value
South Jordan, UT

Elmo Town - Fire Station Addition
Addition - 2,000 SF
Post-Bid
Less than $400,000 est. value
Price, UT 84521

DFCM Construction-Standard Low Bid-DHS/DJJS Dixie Area Detention Center Renovation-19426430
Renovation
Construction
$1,200,000 est. value
Hurricane, UT 84737

Last Updated 05/20/2019 12:11 PM
Project Title

Construction Management/General Contractor Services for New Provo City Public Safety/City Operations and Fire Station #2 Facilities

Physical Address View project details and contacts
City, State (County) Provo, UT 84604   (Utah County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Design Development
Bids Due View project details and contacts
Estimated Value $63,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The CM/GC work for the project consists of two (2) phases: Pre-construction and Construction. 1.Pre-construction Phase: This phase of the work includes, but is not limited to, estimating and cost control, schedule development, drawing and constructability reviews. The CM/GC shall provide a full construction estimate at the Schematic Design, Design Development and 90% Construction Document phases of the project. The CM/GC shall furthermore assist the Owner and Design Consultant in maintaining the cost of construction within the Fixed Limit of Construction Cost (FLCC) and the duration of the construction within the project's schedule. 2.Construction Phase: This phase of the work consists of the CM/GC furnishing and installing all work as required in the Contract Documents. Please note that the work of the Construction Phase may be bid in several packages, such as excavation, footings and foundations, structural steel, etc.
Details
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents