Similar Projects
Last Updated | 05/20/2019 12:11 PM |
Project Title | Construction Management/General Contractor Services for New Provo City Public Safety/City Operations and Fire Station #2 Facilities |
Physical Address | View project details and contacts |
City, State (County) | Provo, UT 84604 (Utah County) |
Category(s) | Government/Public |
Sub-Category(s) | Fire/Police Station |
Contracting Method | Competitive Bids. |
Project Status | Design Development |
Bids Due | View project details and contacts |
Estimated Value | $63,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The CM/GC work for the project consists of two (2) phases: Pre-construction and Construction. 1.Pre-construction Phase: This phase of the work includes, but is not limited to, estimating and cost control, schedule development, drawing and constructability reviews. The CM/GC shall provide a full construction estimate at the Schematic Design, Design Development and 90% Construction Document phases of the project. The CM/GC shall furthermore assist the Owner and Design Consultant in maintaining the cost of construction within the Fixed Limit of Construction Cost (FLCC) and the duration of the construction within the project's schedule. 2.Construction Phase: This phase of the work consists of the CM/GC furnishing and installing all work as required in the Contract Documents. Please note that the work of the Construction Phase may be bid in several packages, such as excavation, footings and foundations, structural steel, etc. | ||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |