Similar Projects
Roof Replacement-GC
Renovation
Sub-Bidding
$6,170,000 CJ est. value
Springfield, MA 01103

Roof Replacement - Sub
Renovation
Sub-Bidding
$6,170,000 CJ est. value
Springfield, MA 01103

Roof Replacement Depot Court
Alteration
Post-Bid
$49,258 est. value
Southwick, MA 01077

Replacement of Roofs, Gutters and Downspouts at Its Morris School
Alteration
Post-Bid
$386,555 est. value
Springfield, MA

West End Rifle Range Roof Replacement
Alteration
Results
$15,000 est. value
Springfield, MA

The Pines 667-2 Development
Alteration
Results
$100,000 est. value
Wilbraham, MA 01095

Police Station Slate Roof Repairs
Renovation
Sub-Bidding
$50,000 CJ est. value
Southwick, MA 01077

On-call Roofing
Term Contract
Post-Bid
$47,000 CJ est. value
Longmeadow, MA 01106

Roof Replacement at the Lower Pioneer Valley Educational Collaborative - Sub Bid
Alteration
Results
$750,000 est. value
West Springfield, MA

Palmer WPCF and Pump Stations Roof Replacement - Painting
Renovation
Post-Bid
$200,000 CJ est. value
Palmer, MA 01069

Roof Replacement at the Lower Pioneer Valley Educational Collaborative - General Bid
Alteration
Results
$750,000 est. value
West Springfield, MA 01089

Repair Barrel Roof, Hangar 1
Renovation
Post-Bid
$1,862,700 CJ est. value
Chicopee, MA 01022

Roof Replacement Project at Southwick Town Hall
Alteration
Results
$850,000 est. value
Southwick, MA 01077

Repair Barrel Roof, Hangar 7
Renovation
Post-Bid
$1,300,000 CJ est. value
Chicopee, MA 01013

Removal/Replacement of Asphalt Shingle Roofing Systems
Alteration
Results
$386,555 est. value
Springfield, MA

Last Updated 09/20/2023 01:37 PM
Project Title

New Asphalt Shingles State CB

Physical Address View project details and contacts
City, State (County) Ludlow, MA 01056   (Hampden County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $24,550 [brand] Estimate
Plans Available from Architect - 08/30/23
Owner View project details and contacts
Architect View project details and contacts
Description

Roof Replacement at Elderly Housing 667-1 Development at 87 State Street, Ludlow, MA. Removal and replacement of shingle roofing, gutters and downspouts, and cladding of fascias A. The Work of the Contract consists of: 1. Roof plan and elevations derived from original drawings by Roy Associates. Engineers, Inc., Waltham, MA 6/4/1991 2. Contractors are to field verify all existing conditions and dimensions prior to bidding. Any discrepancies are to be reported to the architect immediately. 3 Contractors are reminded that not every detail of construction can be shown on the drawings and that not every part of every assembly can be listed in the specifications. The owner assumes that contractors are experienced tradesman who estimate and supply all the required materials for their trades as having visited the site prior to bidding. 4. Protect all existing finishes to remain during construction. Contractor is responsible for repairing any and all existing finishes damaged during construction to the architect and owner's satisfaction. This includes all existing finishes beyond the roof itself not scheduled to be renovated, such as: all site finishes utilized to access area of work; all existing landscaping; all exterior building finishes below the roof level. 5. Existing aluminum gutters and downspouts are to be replaced with new where shown on drawings. 6. Demolish existing asphalt shingle roofing system down to nailboard sheathing. Replace any rotten or damaged nailboard sheathing. Quantity of rotten or damaged plywood sheathing is unknown. Contractor will replace plywood sheathing with new at unit pricing indicated in specifications. 7. Provide and install new asphalt shingle roofing system including but not limited to: asphalt roof shingles, self-adhering membrane leak barrier (entire roof), s yntheti c underlayment (ent ire roof), aluminum drip edge, nails and all necessary fasteners, plastic cement and other sealants, vent piping flashing, masonry flashing, and all other items necessary for a watertight roof system installation. 8. New .032 white aluminum cladding of fascias on all four sides of the building, including squaring up or replacing existing fascias as needed. 9. Contractor must provide a detailed schedule prior to starting work for each area adjacent to a building. The schedule shall take into consideration the required 48 Hour Notice that the LHA needs to inform Residents of the commencement of work. DHCD and the LHA shall review the schedule and approve prior to the start of any work. Proposed work not adhering to the 48 hour resident notification rule will not be allowed. 10. Work either shown on the Drawings or included in the specifications unless specifically indicated not to be done. 11. Work outside the Project Site as called for in the Contract Documents and as required for the performance of the Work. 12. Providing and restoring, where appropriate, all temporary facilities.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents