Last Updated 09/11/2020 02:08 PM
Project Title

Reconstruction/Rehabilitation - District 2

Physical Address View project details and contacts
City, State (County) (Edgefield, Greenwood, McCormick, Newberry, Saluda Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds and Insurance 1.000 Ls Construction Stakes, Lines & Grades 4.000 Ea Traffic Control 1.000 Ls Railroad Insurance and Flagging 001 1.000 Ls Removal & Disposal of Existing Pavement 235.000 Sy Borrow Excavation 5,946.000 Cy Cement Modified Recycled Base (8" Unif)-curing Method B 74,760.000 Sy Cement Modified Recycled Base (10" Unif)-curing Method B 56,881.000 Sy Cement Modified Recycled Base (12" Unif)-curing Method B 36,175.000 Sy Portland Cement for Cement Modified Recycled Base Course 6,143.000 Ton Maintenance Stone 71.400 Ton Liquid Asphalt Binder Pg64-22 1,328.550 Ton Full Depth Asph. Pav. Patching 6" Unif. 595.000 Sy Full Depth Asph. Pav. Patching 8" Unif 5,625.000 Sy Full Depth Asph. Pav. Patching 10"Unif 40.000 Sy Full Depth Asph. Pav. Patching 12"Unif 80.000 Sy Milling Existing Asphalt Pavement 1.5" 12,250.000 Sy Milling Existing Asphalt Pavement 2.0" 64,395.000 Sy Milling Existing Asphalt Pavement (Variable) 8,605.000 Sy Milled-in Rumble Strip 9.080 Mi Hot Mix Asphalt Surface Course Type B 4,647.294 Ton Hot Mix Asphalt Surface Course Type C 17,331.636 Ton Driveway Paving-surface Type B 70.875 Ton Driveway Paving-surface Type C 759.500 Ton Permanent Construction Signs (Ground Mounted) 4,638.000 Sf 4" White Broken Lines -(Gaps Excluded)-fast Dry Paint 6,175.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-fast Dry Paint 616,615.000 Lf 8"White Solid Lines(Crosswalk&channelization)fast Dry Paint 960.000 Lf 24" White Solid Lines (Stop/diagonal Lines)-fast Dry Paint 5,717.000 Lf White Single Arrow (Left, Straight, Right)-fast Dry Paint 22.000 Ea White Word Message "Only"-fast Dry Paint 12.000 Ea Railroad Crossing Symbols - Fast Dry Paint 16.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 18,040.000 Lf 4"Yellow Solid Line(Pvt.edge&no Passing Zone)-fast Dry Paint 676,519.000 Lf 6" Yellow Solid Line on Curb/median - Fast Dry Paint 160.000 Lf 4" White Broken Lines(Gaps Excl.)thermoplastic- 90 Mil. 1,293.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 156,680.000 Lf 8" White Solid Lines Thermoplastic - 125 Mil. 480.000 Lf 12in X 18in White Triang. Yield Bar (Gaps Exc)thermo-125mil 32.000 Lf 24" White Solid Lines (Stop/diag Lines)-thermo.-125 Mil 1,370.000 Lf White Single Arrows (Lt, Strght, Rt) Thermo.-125 Mil. 5.000 Ea White Word Message "Only" -thermoplastic - 125 Mil. 2.000 Ea White Word Message "Stop Ahead" -thermoplastic - 125 Mil. 2.000 Ea Railroad Crossing Symbols - Thermoplastic - 125 Mil. 4.000 Ea 4" Yellow Broken Lines(Gaps Exc)thermoplastic - 90 Mil. 4,330.000 Lf 4" Yellow Solid Lines(Pvt.edge Lines) Thermo-90 Mil. 168,717.000 Lf Permanent Clear Pavement Markers- Mono-dir.- 4"X4" 72.000 Ea Permanent Yellow Pavement Markers Mono-dir.- 4"X 4" Perm. Yel. 58.000 Ea Permanent Yellow Pavement Markers Bi-dir.- 4"X4" 1,132.000 Ea Furnish & Install 1.0" Schedule 80 Pvc Conduit 777.000 Lf Furnish & Instl No. 14 Copper Wire,1-conductor for Loop Wire 8,340.000 Lf Sawcut for Loop Detector 2,454.000 Lf 13"X24"X12"D.elec.flush Undgrd.enclosure-(Str.poly.conc.)hd 11.000 Ea Adjust Drop Inlet Adjust D. I. 1.000 Ea Detectable Warning Material 100.000 Sf Pedestrian Ramp Construction 200.000 Sy Surface Applied Detectable Warning 180.000 Sf Remove & Dispose Semi-rigid Gr Device 200.000 Lf Premash W-beam Strong Post System Wsp3 362.500 Lf Mt3 Leading End Treatment Tl3 32.000 Ea Mgs3cs Gr Compressed Shoulder 875.000 Lf Premash Type T Tl3 Leading 50` 4.000 Ea Permanent Grassing for Non-permitted Resurfacing Projects 14.267 Acre Sediment Tubes for Ditch Checks 360.000 Lf Silt Fence 2,460.000 Lf Replace/repair Silt Fence 246.000 Lf Removal of Silt Retained by Silt Fence 620.000 Lf

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents