Similar Projects
SR 539/Bay-Lyn Dr to International Boundary - Corridor Improvements
Infrastructure
Conception
$27,000,000 est. value
Lynden, WA 98264

D/B - GSA LPOE Pacific Highway, WA. Lane Expansion Project
Infrastructure
Design
$20,000,000 est. value
Blaine, WA 98230

AMBK Waterfront Lofts
New Construction, Infrastructure
Design
$7,000,000 CJ est. value
Bellingham, WA 98225

F-Street Crossing
Infrastructure
Bidding
$1,500,000 CJ est. value
Bellingham, WA 98225

F-Street Crossing
Infrastructure
Bidding
$1,500,000 CJ est. value
Bellingham, WA 98225

Pedestrian and Bicycle Master Plan Update
Alteration
Post-Bid
Bellingham, WA

Road Overlay
Infrastructure
Post-Bid
Sumas, WA

Engineering Services for Parking Lot And Trailhead Development & Stormwater Management Plan
New Construction, Infrastructure
Results
Blaine, WA 98230

Small Area Paving Project - 2021, CRP No. 921006
Infrastructure
Results
$190,000 to $220,000 est. value
Bellingham, WA

SR 542/Squalicum Creek to Bellingham Bay - Fish Passage
Infrastructure
Design
$3,633,000 CJ est. value
Deming, WA 98244

Hundred Acre Wood Phase 1 RFQ
Infrastructure
Bidding
$1,000,000 CJ est. value
Bellingham, WA 98225

Station 81 Site Preparation
Infrastructure
Post-Bid
Everson, WA 98247

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

I-5/Squalicum Creek to SR 539 - Bridge Deck Overlays
Infrastructure, Renovation
Design
$825,000 CJ est. value
Bellingham, WA 98229

RFQ Contractor - Opportunity Council Cordata Phase 1 and 2 Apartments
New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Bellingham, WA 98226

Last Updated 10/05/2022 12:32 PM
Project Title

Thornton Street, Vista Drive to Malloy Avenue Project

Physical Address View project details and contacts
City, State (County) Ferndale, WA 98248   (Whatcom County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $4,750,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This contract provides for improvements of approximately 1,750 linear feet of Thornton Street, from the intersection of Thornton Street and Vista Drive, then easterly to the intersection of Thornton Street and Malloy Avenue, in Ferndale, Washington. Work will include clearing, grubbing, grading, roadway excavation, storm sewer drainage improvements, water main installation, sanitary sewer installation, placing gravel base, hot mix asphalt paving, concrete speed table, Rectangular Rapid Flashing Beacon (RRFB), curb and gutters, sidewalks, ADA ramps, and other work, in accordance with the Contract Plans, Special Provisions, the Standard Specifications, and Standard Plans. All bid proposals shall be accompanied by a bid proposal deposit in cash, certified check, cashier's check, or surety bond in an amount equal to five percent (5%) of the amount of such bid proposal. Should the successful bidder fail to enter into such contract and furnish satisfactory performance bond and payment bond both in an amount of 100 percent (100%) of the contract price within the time stated in the specifications, the bid proposal deposit shall be forfeited to the City of Ferndale. All bidders and subcontractors shall have a contractor's license to work in the State of Washington and a City of Ferndale Business License before starting work. All work performed on this project will be subject to prevailing federal Davis-Bacon and/or state wage rates. The (Local Agency), in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The contractor, subrecipient, or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of USDOT-assisted contracts. Failure by the contractor to carry out these requirements is a material breach of this contract which may result in the termination of this contract or such other remedy as the recipient deems appropriate, which may include, but is not limited to: (1) Withholding monthly progress payments; (2) Assessing sanctions; (3) Liquidated damages, or (4) Disqualifying the contractor from future bidding as non-responsible. The City of Ferndale is an Equal Opportunity and Affirmative Action Employer. Minority and Women-Owned firms are encouraged to submit bids.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents