Reported | 02/14/2020 12:00 AM |
Project Title | Phase I – Route 20 Corridor Sewer Upgrades |
Physical Address | View project details and contacts |
City, State (County) | Shrewsbury, MA (Worcester County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sanitary Sewers |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | $3,600,000 |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The scope of work includes construction of approximately 4,750 linear feet of 8-inch fused HDPE sewer force main, 4,325 linear feet of 6-inch fused HDPE sewer force main, 300 linear feet of 15inch PVC gravity sewer, 600 linear feet of pipe insulation, four (4) four-foot diameter force main clean out manholes, two (2) six-foot diameter dual force main cleanout manholes, four (4) five-foot diameter force main air relief valve manholes, one (1) six-foot diameter dual force main cleanout manhole, the Flint Pond Bridge Sewer Crossing from STA 21+75 to 23+50 on the Edgemere PS to BT PS alignment, Arrowwood Pump Station upgrades, Edgemere Pump Station upgrades, environmental protection, removal and disposal of 3,000 linear feet of abandoned cast iron water main, removal and disposal of 200 linear feet of asbestos cement water main, and 9,250 linear feet of pavement replacement. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |