Similar Projects
Frames and Grates
Bidding
Leicester, MA

Cured-In-Place-Pipe (CIPP) Lining
Bidding
$900,000 est. value
Dudley, MA

Sewer System Evaluation Survey 2020
Post-Bid
Clinton, MA

Siphon/Various Sewers Heavy Cleaning and Inspection
Post-Bid
Fitchburg, MA

Sewer Main Replacement at Lancaster Complex
Results
Less than $281,361 est. value
Lancaster, MA

CCTV Clean and Inspection of Sanitary and Surface Sewers/DPW and Parks
Results
$546,000 est. value
Worcester, MA

Installation of new 8" Sewer for the new Beal School
Post-Bid
Less than $1,500,000 est. value
Shrewsbury, MA

Church Street Infrastructure Improvements
Results
$290,000 est. value
Athol, MA 01331

Project 2 and 3 Sewer Rehabilitations
Post-Bid
Holden, MA

Auburn Sewer System Flow Monitoring
Results
Less than $140,000 est. value
Auburn, MA 01501

Precast Concrete Structures, Manhole and Catch Basin Adjusting Rings
Term Contract
Post-Bid
Holden, MA

Pequoig Avenue Sewer Lining
Results
Less than $210,000 est. value
Athol, MA 01331

Clean and Repair Catch Basins on Various Town Roads
Term Contract
Post-Bid
Rutland, MA

Sewer/Drainage/Water Construction Services 2020
Term Contract
Results
Leominster, MA 01453

Catch Basin Cleaning
Post-Bid
Westminster, MA 01473

Reported 02/14/2020 12:00 AM
Project Title

Phase I – Route 20 Corridor Sewer Upgrades

Physical Address View project details and contacts
City, State (County) Shrewsbury, MA   (Worcester County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $3,600,000
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes construction of approximately 4,750 linear feet of 8-inch fused HDPE sewer force main, 4,325 linear feet of 6-inch fused HDPE sewer force main, 300 linear feet of 15inch PVC gravity sewer, 600 linear feet of pipe insulation, four (4) four-foot diameter force main clean out manholes, two (2) six-foot diameter dual force main cleanout manholes, four (4) five-foot diameter force main air relief valve manholes, one (1) six-foot diameter dual force main cleanout manhole, the Flint Pond Bridge Sewer Crossing from STA 21+75 to 23+50 on the Edgemere PS to BT PS alignment, Arrowwood Pump Station upgrades, Edgemere Pump Station upgrades, environmental protection, removal and disposal of 3,000 linear feet of abandoned cast iron water main, removal and disposal of 200 linear feet of asbestos cement water main, and 9,250 linear feet of pavement replacement.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents