Similar Projects
Rob Jaggers Main Water Line
Design
$200,000 to $400,000 est. value
NM

Coronado Waterline Improvement Project
Infrastructure
Bidding
Espanola, NM

Lower Rio Grande Public Water Works Authority Vado Water System Improvements
Infrastructure
Bidding
La Mesa, NM

Wastewater and Water System Improvements Project
Post-Bid
Cimarron, NM 87714

Construction of the Wastewater Collection Lines
Post-Bid
Cimarron, NM 87714

Valle Del Rio Water System Improvements
Results
La Mesa, NM

Advanced Metering Infrastructure
Results
Less than $963,817 est. value
Truth or Consequences, NM 87901

Public Water System and Water Storage Tank Improvements
Infrastructure
Bidding
Acomita, NM

El Creston MDWCA Water System Improvements Project
Post-Bid
Las Vegas, NM 87701

2018 Colonias Water System Improvements
Results
$373,870 est. value
Lordsburg, NM 88045

Vista Del Rey Estates MDWCA Water System Improvements
Infrastructure
Bidding
Las Cruces, NM

Rudolfo Road Water System Improvement Project
Post-Bid
Santa Fe, NM 87502

Hemlock Circle Waterline Replacement Phase II
Results
$430,000 est. value
Ruidoso, NM

East Culpepper Water Connection for North Star MDWCA
Infrastructure
Bidding
Aztec, NM

Black Mesa 3 Dam Outlet Raymac Dam to Mccoy Dam Phase V Project
Post-Bid
$3,464,000 est. value
Albuquerque, NM 87107

Last Updated 10/01/2021 03:07 PM
Project Title

Upper Holman MDWCA Water System Improvements Project

Physical Address View project details and contacts
City, State (County) Santa Fe, NM   (Santa Fe County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 to $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes the installation of approximately 1,969 linear feet of 2-inch PVC waterline and appurtenances, including 60 linear feet installed by jack and bore to cross NM-121; new connections to existing Wells No. 1 and No. 2, a hot tap connection to the existing water storage tank, and new valves and appurtenances. This project also includes additive bid alternates to furnish and install new radio read meters, and to complete improvements to an existing roadway.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents