Similar Projects
Vermillion Acres Senior Housing
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Hastings, MN 55033

2020 Assessment Job No. 1 Main Street Utility and Street Reconstruction
Post-Bid
$1,700,000 est. value
Greenbush, MN

Grading, Aggregate Base, Bituminous Surfacing, Concrete Curb and Gutter, Concrete Walks, Water Main, Sanitary Sewer, and Related Restoration
Post-Bid
MN

Phase 3A-2 Infrastructure Improvements
Results
Tracy, MN

2021 Infrastructure Improvements
Results
$1,500,000 to $2,000,000 est. value
MN

Eagle's Landing Subdivison
Construction
Inver Grove Heights, MN 55076

Orchard Place Retail Center
Addition - 24,800 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Apple Valley, MN 55124

Zentih Tiny Home Neighborhood
New Construction, Infrastructure - 19,250 SF
Pending Verification
Duluth, MN 55806

Energy Hills, Woodland Ponds, Wintergreen Area Street Reconstruction
Post-Bid
Maple Grove, MN

Edgewood Avenue, St Peter Avenue, Stanley Avenue and Ulstad Avenue Reconstruction
Results
$2,500,000 to $4,000,000 est. value
Albert Lea, MN 56007

Blanket Flower SNA Gravel Pit Reclamation
Post-Bid
MN

2021 Site Improvements
Results
Monticello, MN 55362

Sauk Rapids Area Public Water Access
Term Contract
Post-Bid
Sauk Rapids, MN

2020 City Project No. 2 Campground Expansion
Results
$600,000 est. value
Warroad, MN

Forestry R2 NE Region Ground Site Preparation and Release
Post-Bid
Aitkin, Cloquet, Deer River, Hibbing, Littlefork, Tower, Two Harbors, MN

Last Updated 08/31/2022 09:05 AM
Project Title

Improvement of Judicial Ditch No. 11 Lateral D and County Ditch No. 26 Main and Branches

Physical Address View project details and contacts
City, State (County) Olivia, MN 56277   (Renville County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $1,056,241 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 31, 2022, project was awarded to Lindahl Bros awarded amount is $1,056,241.49 ** The work includes the construction of approximately: Exploratory Excavation Hours 130 Drain Tile Connection Each 110 Intakes Each 20 6"-36" Drain Tile LF 22,600 together with numerous related items of work, all in accordance with Plans and Specifications. This project is subject to Responsible Contractor Certification. COMPLETION OF WORK: All work under the Contract must be complete by November 3, 2023 A Proposal Bond in the amount of not less than 5 percent of the total amount bid, drawn in favor of High Island Watershed District shall accompany each bid. OWNER'S RIGHTS RESERVED: The Owner reserves the right to reject any or all bids and to waive any irregularities and informalities therein and to award the Contract to other than the lowest bidder if, in their discretion, the interest of the Owner would be best served thereby.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents