Last Updated | 12/28/2022 11:31 PM |
Project Title | Foglia Center for Advanced Technology and Innovation Mchenry County College |
Physical Address | View project details and contacts |
City, State (County) | Crystal Lake, IL 60012 (McHenry County) |
Category(s) | Commercial, Education, Entertainment/Recreation, Heavy and Highway, Laboratory |
Sub-Category(s) | College/University, Laboratory, Office, Site Development, Theaters/Auditoriums |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | All Bids Received, Selection Underway, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $22,000,000 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of an approximately 48,000 square foot classroom and teaching lab facility at McHenry County College. The new facility consists of three high-bay teaching laboratories opposite two-stories of classroom, office, conference, and service spaces. A glass-enclosed link will connect the new facility to the existing adjacent Building C. New storage space for the existing black box theater in Building E is also included. Single Prime Delivery Method: Either the Single Prime Bidder or a protected subcontractor must be listed for each trade provided on the Bid Form. Only one protected subcontractor may be listed for each trade. Failure to identify the name and bid proposal cost of each listed protected subcontractor on the provided Bid Form or providing more than one protected subcontractor for each trade will be a material deficiency (no time will be allowed after bid opening to remedy deficiency) and will result in the rejection of the bid. All protected subcontractors listed must be prequalified with CDB in accordance with CDB Standard Documents for Construction, Article 00 21 05. GENERAL under $ 22,000,000 Meeting participants will not be able to ask questions either verbally or via the meetings chat feature. Minority, Women, Persons with Disabilities and Veteran Business Subcontractor/Supplier Participation is Applicable. The participation goal percentages on the amount of the contract awarded by CDB for this project are: 25% MBE, 5% WBE, 3% PBE/VBE. |
||||||||||||||||||||||||||||||||||||||||
Details | 2 Stories Above Grade, 48,000 SF.
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |