Similar Projects
Floating Dock Materials – Danbury Fire Department
Bidding
Danbury, CT

Z--Design-Build Nautilus Pier Water Taxi Dock, NAVSUBASE New London, CT
New Construction
Post-Bid
$500,000 to $1,000,000 est. value
Groton, CT 06349

Replace/Repair Dock System at Marina
Post-Bid
Danbury, CT 06812

Marine Construction and Maintenance Service
Term Contract
Results
Greenwich, CT

Annual Servicing of Anchorage Markers and Dock Floats
Results
Essex, CT

Ferry Slip
Construction
New London, CT

Design-Bid-Build, P1097 Relocate Underwater Electromagnetic Measurement System
Post-Bid
$1,000,000 to $5,000,000 est. value
New London, CT

P898, Replace Pier 32 at NAVSUBASE New London, CT
New Construction, Demolition
Results
$25,000,000 to $100,000,000 est. value
Groton, New London, CT 06340

Nautilus Pier Water Taxi Dock
Post-Bid
Groton, CT 06340

New London Waterfront Repairs and Maintenance
Results
New London, CT

Branford Point Seawall and Wharf Repair
Post-Bid
Branford, CT

Marine Inspection and Repair Services
Term Contract
Results
Groton, CT

Design, Fabrication and Installation Services for Baldwin Bridge State Boat Launch Floating Dock Systems
Post-Bid
Old Saybrook, CT 06475

Thames River Marina Dock Removal Project
Results
Waterford, CT 06385

New Business Venture - Waterfront Promenade
Post-Bid
New London, CT

Last Updated 01/07/2021 09:52 AM
Project Title

2020-2021 Sand Point Emergency Operation Dock

Physical Address View project details and contacts
City, State (County) Portsmouth, RI 02871   (Newport County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Demolishing and disposal of four (4) existing piles 2. Demolishing and disposal of existing gangway 3. Demolishing and disposal of existing 10-ft. x 40-ft. float 4. Supply CCA pile, timbers, and hardware for triangular platform 5. Build platform and move curb 6. Supply and drive four (4) 45-ft., 135/8-in. OD heavy wall coated steel pipe piles 7. Supply and install four (4) 16-in. OD HDPE sleeves over the new pipe piles 8. Supply and install new Belling Marine single piece 10-ft. x 40-ft. float with heavy duty pile guides or equal 9. Supply and install new 4-ft. x 20-ft. aluminum gangway with 4-ft. apron plate 10. Supply and install steel pipe crossbar between two (2) southern pipe piles to provide lifting point for gangway 11. Supply and install four (4) pile caps

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents