Similar Projects
Weatherization (IHWAP) Program
Term Contract
Bidding

Wet Dust Collector
Post-Bid
$100,000 to $250,000 est. value
Belleville, IL 62225

HVAC Close Loop Water Test-Treat
Post-Bid
Belleville, IL 62225

HVAC Chiller Maintenance
Results
Belleville, IL 62225

FY21 HVAC Cooling Tower Treatment
Results
Belleville, IL 62225

Re-Bid Insulation Repair Services For Plumbing And Heating, Cooling, Ventilation Systems
Term Contract
Post-Bid
Springfield, IL 62701

HVAC Renovation and New Gym Addition Pathways at Elementary School
Alteration
Results
Belleville, IL 62221

HVAC Preventive Maintenance and Repair Services
Term Contract
Post-Bid
East Saint Louis, IL

PAV HA 6th Floor Lab - RO System Upgrade BP-02 (GC)
Alteration
Results
Lexington, KY 40506

HVAC and Mechanical Products
Term Contract
Post-Bid

Exhaust/Make-Up Air System
Post-Bid
Sauget, IL 62201

HVAC Roof Top Units
Alteration
Post-Bid
Dupo, IL

HVAC Chiller Maintenance
Term Contract
Post-Bid
Scott Air Force Base, IL 62225

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

FY22 HVAC Cooling Tower
Term Contract
Post-Bid
Scott Air Force Base, IL 62225

Reported 09/11/2021 12:00 AM
Project Title

Repair HVAC Systems

Physical Address View project details and contacts
City, State (County) Scott Air Force Base, IL   (Saint Clair County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The following is needed: HVAC repairs for various buildings across the 126th Air Refueling Wing, below is a brief synopsis of the work that is needed – Bldg 5000: • VFD continuously blowing fuses, needs to be replaced. VFD located in Bldg 5000 mechanical room. • Main chiller blowing fuses as well, needs to be troubleshooted to determine cause • HVAC system as a whole not producing enough airflow to what DDC system set points are shown to be. Getting 1/3 to 1/4 of design airflow on second floor and some portions of first floor. Bldg 5026: • System is leaking refrigerant (R-22). Leak is currently unknown, needs to be found and fixed. Bldg 5022: •Replace condenser pan or route condensing system to avoid leak. Existing pan is no longer usable. Bldg 5010: • Repair HVAC system • Recover refrigerant • Install new expansion valves and modules on CKT #1 and CKT #2 (must change both circuits as existing parts are no longer available). • Bind sensor and module • Pressurize and leak check chiller • Charge with recovered refrigerant Bldg 5016: • Replace condenser fan motor and contactor on cooling unit

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents