Similar Projects
Pocahontas County Schools ESSER HVAC Improvements
Alteration
Bidding
Buckeye, WV

J046--Exercise OY 2 DI Water System Maintenance & Treatment (VA-21-00004150)
Post-Bid
Clarksburg, WV

HVAC and Mechanical Products
Term Contract
Post-Bid

Z--Eye Clinic HVAC Replacement Project Number 540-19-104
Results
$250,000 to $500,000 est. value
Bridgeport, WV 26330

Z1DA--Purple Firm HVAC Upgrade - Construction Project Number 540-20-502
Results
$500,000 to $1,000,000 est. value
Clarksburg, WV

FBI CJIS Boiler Inspection Services
Post-Bid
Clarksburg, WV

Walk in Outdoor Cooler/Refrigerator
Results
$8,102 est. value
Clarksburg, WV 26301

H212--Sprinkler Wet System (VA-21-00055268) Flow Test
Post-Bid
Clarksburg, WV 26301

Fire Alarm and Sprinkler Systems
Term Contract
Results
Clarksburg, WV 26301

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Boiler Repairs - Salem Correctional Center and Jail
Results
$170,060 est. value
WV

N041--Air Stack Modular Chiller System Troubleshooting & Repair
Term Contract
Post-Bid
Clarksburg, WV 26301

Inspections Testing Maintenance Repair Monitoring
Term Contract, Alteration
Results
Clarksburg, WV 26301

Interior Painting at 6 Locations Central WV Community Action
Renovation
Post-Bid
WV

Backflow Testing / Inspection Services
Term Contract
Post-Bid
Beaver, Bluefield, Charleston, Clarksburg, Grafton, Kingwood, Lewisburg, Morgantown, Nitro, Parkersburg, Rainelle, WV 26101

Last Updated 02/08/2022 03:20 PM
Project Title

MHI Building Renovations

Physical Address View project details and contacts
City, State (County) Bridgeport, WV   (Harrison County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior, Fire Protection, HVAC, Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The approximate quantities of Work to be Bid upon is as described as follows: Renovation of the building HVAC and Fire Alarm systems. The building is Type II Non-combustible construction containing aircraft hangars, administrative offices, and support facilities. The systems to be renovated support approximately 149,000 SF. Renovations consist of: Complete replacement of the existing HVAC system including removal of the existing natural gas fired boilers and pumps, water source heat pumps, make up air water source heat pump handlers, cooling tower, heating/ventilation units, associated piping and controls as well as selective demolition and new ceilings, in areas of the Work. The new system will consist of ducted VRF air handlers, VRF cassette units, a new energy recovery unit is to be installed in the existing mechanical room. New gas radiant heaters will be provided for service bays I, II, III, and IV. A new control system will provide central as well as individual unit control of space temperature and equipment operation. Fire Alarm detection and signaling devices will be upgraded and replaced.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 09 - Finishes, Ceilings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm, Fire Alarm Initiating Devices.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents