Similar Projects
North Seattle College Mechanical Upgrades
Alteration
Bidding
$260,000 to $310,000 est. value
Seattle, WA 98103

WWTP Boiler Maintenance Services
Term Contract
Bidding
Federal Way, WA

Seattle International Airport Main Terminal Low Voltage Upgrade - Bid Package 4 - Mechanical
Alteration
Sub-Bidding
$2,000,000 to $2,750,000 est. value
Seatac, WA 98188

Mechanical Construction Work Order
Alteration
Post-Bid
Seattle, WA

Kent Phoenix Boiler and Water Heater Replacement
Alteration
Post-Bid
Kent, WA 98030

Mechanical and Plumbing On Call Portwide
Alteration
Results
$300,000 est. value
Seattle, WA

South Treatment Plant Heating Systems Improvements
Alteration
Results
Seattle, WA

Emerald Park Elementary Boiler Replacement
Alteration
Post-Bid
Kent, WA 98031

Hazen High School Pool Modernization
Alteration
Results
$9,100,000 est. value
Renton, WA

Mechanical and Electrical Work at Heron Landing Apartments
Alteration
Post-Bid
Kenmore, WA 98028

Mechanical and Electrical Work at Heron Run Apartments
Alteration
Post-Bid
Kenmore, WA 98028

Mechanical and Electrical Work at Plum Court Apartments
Alteration
Post-Bid
Kirkland, WA 98033

Mechanical Contractor / Construction Manager - Alki Elementary Modernization and Replacement
Renovation
Post-Bid
Seattle, WA 98116

Somerset Elementary School Boiler Replacement
Alteration
Post-Bid
$200,000 est. value
Bellevue, WA 98006

Boiler And Water Heater Replacement
Term Contract
Post-Bid
Bellevue, WA 98005

Reported 05/20/2022 12:00 AM
Project Title

Design - Chiller Control Panel Replacement Phase 2 - Building Engineering Systems

Physical Address View project details and contacts
City, State (County) Seatac, WA 98188   (King County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Accepting Qualifications, Construction Start Expected May 2023
Bids Due View project details and contacts
Estimated Value $625,000 to $815,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes: Remove five (5) existing chiller control panels in the SeaTac International Airport Central Mechanical Plant. Retain and re-use existing field wiring and power source for use with replacement panels. Provide and install replacement chiller control panels. Procure the services of Siemens Building Technologies to reconfigure new chiller panel control I/O points at existing DDC Control Panel.

Details

Division 03 - Concrete, Precast Concrete Specialties, Precast Pre-Framed Concrete Panels.
Division 42 - Process Heating, Cooling, and Drying Equipment, Process Chillers and Coolers, Centrifugal Process Chillers and Coolers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents