Similar Projects
Vancouver Innovation Center Master Plan
New Construction, Renovation, Infrastructure
Conception
Vancouver, WA 98683

Z--Rehabilitate Parking Area, Ruby Beach
Term Contract, Infrastructure, Alteration
Design
$500,000 to $1,000,000 est. value
Port Angeles, WA 98362

Richland Innovation Center Sidewalk and Street Light Improvements
Infrastructure
Bidding
$620,000 to $680,000 est. value
Richland, WA 99354

2022 Curb Ramps for Overlay
Infrastructure
Bidding
$510,000 to $565,000 est. value
Renton, WA

Garrison Middle School Sidewalk Improvement
Infrastructure
Post-Bid
Walla Walla, WA 99362

Curb Management Plan
Infrastructure
Post-Bid
$150,000 to $225,000 est. value
Bellevue, WA 98007

Nugget Park Sidewalk Replacement
Infrastructure
Results
$275,000 to $350,000 est. value
Brier, WA 98036

2021 Sidewalk And ADA Improvements
Infrastructure
Results
$200,000 to $300,000 est. value
Auburn, WA 98092

Mercy Housing Affordable Senior Development
New Construction - 43,000 SF
Construction
$1,850,000,000 est. value
Tacoma, WA 98405

Derek Apartments Phase 1
New Construction, Infrastructure - 400,000 SF
Pending Verification
$10,000,000 CJ est. value
Spokane Valley, WA 99206

Mission Ridge Resort Expansion
New Construction
Pending Verification
Wenatchee, WA 98801

2022 West Curb Ramps
Infrastructure
Bidding
Vancouver, WA 98687

Traffic Signal Improvements - City Wide Phase 2
Infrastructure
Post-Bid
$3,900,000 to $4,700,000 est. value
Pasco, WA

Fisherman's Harbor Commercial Development Parcels A8 & A17
New Construction, Infrastructure, Alteration - 6,000 SF
Results
$4,300,000 to $4,700,000 est. value
Everett, WA 98213

Bremerton Station
Renovation, Infrastructure
Pending Verification
Bremerton, WA 98310

Last Updated 03/10/2022 02:07 PM
Project Title

Alder St- University Way to Dean Nicholson Blvd & 14th Ave Trail & Signalization

Physical Address View project details and contacts
City, State (County) Ellensburg, WA 98926   (Kittitas County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,572,425
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Contract provides for the improvement of a concrete sidewalk/trail that connects the Palouse to Cascades Trail to 14th Avenue Dean Nicholson Boulevard along Alder Street. In addition to the trail connection, a traffic signal modification to improve safety and turning movements will occur at Alder Street University Way and a new traffic signal will be installed at Alder Street and Dean Nicholson Boulevard. To complete this work, the Contractor will be required to perform, but not limited to, clearing and grubbing. roadway excavation, concrete removal, Grading, drainage, utility adjustments, surfacing, paving, concrete, sidewalks and ramps, signing, pavement marking, traffic signals, illumination modifications, landscaping, irrigation, and other work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents