Similar Projects
River Street Storm Sewer Improvements - M3635 - City Of Iowa City
Infrastructure
Conception
$600,000 CJ est. value
Iowa City, IA 52246

River Street Storm Sewer Improvements - M3635 - City Of Iowa City
Infrastructure
Conception
$600,000 CJ est. value
Iowa City, IA 52246

Steindler Orthopedic Clinic Ambulatory Surgery Center
New Construction, Infrastructure - 35,880 SF
Design
$19,200,000 CJ est. value
North Liberty, IA 52317

Steindler Orthopedic Clinic Ambulatory Surgery Center
New Construction, Infrastructure - 35,880 SF
Design
$19,200,000 CJ est. value
North Liberty, IA 52317

Castek Park Trail Reconstruction
Infrastructure
Post-Bid
$67,000 CJ est. value
Swisher, IA 52338

Castek Park Trail Reconstruction
Infrastructure
Post-Bid
$67,000 CJ est. value
Swisher, IA 52338

Cedar River Crossing and Sutliff Bridge-West Area Improvements
New Construction, Infrastructure
Results
Oxford, IA

PCC Pavement - Grade and New
Infrastructure
Results
IA

PinSeekers Golf & Entertainment Facility / Tiffin
New Construction, Infrastructure - 49,022 SF
Construction
$11,000,000 CJ est. value
Tiffin, IA 52340

PinSeekers Golf & Entertainment Facility / Tiffin
New Construction, Infrastructure - 49,022 SF
Construction
$11,000,000 CJ est. value
Tiffin, IA 52340

Kwik Trip #1213 North Liberty / Tiffin
New Construction, Infrastructure - 11,056 SF
Pending Verification
$3,000,000 CJ est. value
Tiffin, IA 52340

Kwik Trip #1213 North Liberty / Tiffin
New Construction, Infrastructure - 11,056 SF
Pending Verification
$3,000,000 CJ est. value
Tiffin, IA 52340

Lower City Park Shelters and Restroom Replacement - R4358 - City of Iowa City
Demolition, New Construction, Infrastructure
Conception
$490,000 CJ est. value
Iowa City, IA 52240

Dubuque Street Reconstruction - S3939 - City of Iowa City
Infrastructure
Design
$2,100,000 est. value
Iowa City, IA 52240

Hawkeye Wildlife Unit North Road and Babcock Access Road Maintenance
Infrastructure
Post-Bid
$190,000 est. value
Oxford, IA

Last Updated 06/27/2023 09:16 AM
Project Title

2023 Monroe Street Improvements

Physical Address View project details and contacts
City, State (County) University Heights, IA 52246   (Johnson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $155,641 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Project will involve the following: Removal and replacement of PCC pavement panels on Monroe Street. The work also involves removal and replacement of the adjacent PCC driveway aprons, removal of an existing 4 subdrain, installation of a larger subdrain pipe with connections to sump pumps and downspout drains, flowable mortar cutoff walls with subdrain pipe, and sign assembly removal and reinstallation The project has a late start date of August 14, 2023 and will be substantially complete, and ready for use on or before September 29, 2023 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents