Similar Projects
Yacht Basin Bulkhead Repair at Care Terminal
Infrastructure
Bidding
$500,000 CJ est. value
Houston, TX 77002

Proposed Hickory Twig Lift Station Improvements
Renovation
Bidding
$590,000 CJ est. value
Houston, TX 77002

Informal - Hydromatic Pump Check Valves CM-TB
Infrastructure
Post-Bid
Houston, TX

Miscellaneous Plumbing Parts and Supplies
Infrastructure
Post-Bid
Houston, TX

Blanket Purchase Agreement- Plumbing Repairs-Supplies/Services
Results
San Antonio, TX

Webster City Hall Water Fountain
Results
Webster, TX 77598

Detention Pond, Storm Sewer and Paving On Behalf Of Southeast Regional Management District and Private Water and Sanitary Sewer (Quadvest LP) to Serve Flagstone Section 2
Infrastructure
Bidding
$200,000 CJ est. value
Houston, TX 77002

Mechanical, Electrical and Plumbing MEP (JOC)
Alteration
Post-Bid
Houston, TX

Plumbing Maintenance and Repair Services
Term Contract
Results
Pasadena, TX

Mechanical Electrical and Plumbing Service
Term Contract
Post-Bid
Houston, TX

District Wide Plumbing Parts and Supplies
Term Contract
Results
Humble, TX

2022 FRP MEP Project
Alteration
Post-Bid
$3,000,000 est. value
Spring, TX

District Wide Plumbing Services
Alteration
Results
Aldine, TX

Mechanical, Electrical, and Plumbing Service
Alteration
Post-Bid
Houston, TX

N19 Welding and Construction Renovations
Renovation
Results
$1,883,434 est. value
Houston, TX 77049

Last Updated 09/22/2022 04:29 PM
Project Title

Water, Sanitary Sewer, and Drainage Facilities and Paving and Appurtenances to Serve Sorella Landing Lane Phase II

Physical Address View project details and contacts
City, State (County) Houston, TX 77002   (Harris County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work of the Contract includes the following: Construction of the Water, Sanitary Sewer, and Drainage Facilities and Paving and Appurtenances to Serve Sorella Landing Lane Phase II. Each Bid must be accompanied by a Bid Bond or a certified or cashier's check, acceptable to the Owner, in an amount not less than two percent (2%) of the total amount Bid, as a guarantee that the successful bidder will enter into the Contract and execute the Bonds on the forms provided, and provide the required insurance certificates within seven (7) days after the date Contract Documents are received by the Contractor. If a certified or cashier's check is provided, the successful bidder shall deliver, at the bid opening address, the original certified or cashier's check within twenty-four (24) hours of receipt of the bid opening. A Bidder submitting electronic Bids must submit its Bid and bid securities in compliance with Owner's Order Adopting Section 49.2731 Electronic Bidding Rules and all electronic Bids and bid securities must be submitted through online. Bidders must register and obtain bidding documents on this website for the required payment amount (if any) to submit an electronic bid. By submitting a Bid, Bidder acknowledges and agrees that the Contract Documents may be accepted, executed or agreed to through the use of an Electronic Signature, as defined by and in accordance with Owner's Electronic Signature Rules for Construction Contracts. The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in bidding or bidding process except time of submitting a Bid. The Successful Bidder, if any, will be the responsible Bidder which in the Board's judgment will be most advantageous to the District and result in the best and most economical completion of the Project. The requirements of Subchapter J, Chapter 552, Government Code, may apply to this Bid and/or Contract and the Contractor agrees that the Contract can be terminated if the Contractor knowingly or intentionally fails to comply with a requirement of that subchapter.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents