Similar Projects
Station 28 Pavement Maintenance
Infrastructure
Post-Bid
Carol Stream, IL

Churchill Woods Fuel Tank Removal and Site Remediation
Infrastructure
Post-Bid
Carol Stream, IL 60188

Systemwide Roadway Appurtenance Repairs
Results
Downers Grove, IL

2021 Asphalt Paving and Patching Program
Alteration
Results
Lombard, IL

Dash Downers Grove Apartments
New Construction, Infrastructure
Construction
$40,000,000 CJ est. value
Downers Grove, IL 60515

Tri-State Tollway (I-294) Roadway and Bridge Reconstruction
Infrastructure
Construction
$205,907,075 CJ est. value
Hinsdale, IL 60521

Park Avenue West Bridge/Pavement Joint Repair
New Construction, Infrastructure
Post-Bid
Clarendon Hills, IL 60514

Gary Avenue (Geneva to Saint Charles)
Infrastructure
Results
$897,733 est. value
Wheaton, IL

Naper Commons Park Development
Infrastructure
Construction
$250,096 CJ est. value
Naperville, IL 60540

Alley Maintenance
Term Contract
Post-Bid
Bensenville, IL

2021 Crack Filling Program
Infrastructure
Results
$60,000 est. value
Clarendon Hills, IL

2022 Abbeywood South Park Asphalt Pathway Replacement
Infrastructure
Post-Bid
Lisle, IL

2021 Patching Program
Infrastructure
Results
$26,100 est. value
Clarendon Hills, IL

2022 Roads Program
Infrastructure
Post-Bid
Bloomingdale, IL

2021 Asphalt Pathway Repairs
Infrastructure
Results
Lisle, IL

Last Updated 03/20/2023 04:35 PM
Project Title

Downtown Washington Street Bridge Rehabilitation - BR031- City of Naperville

Physical Address View project details and contacts
City, State (County) Naperville, IL 60540   (DuPage County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $3,125,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 20, 2023, a design firm has been selected. The stage of design and a firm timeline for construction has not been determined. This project is included in the City of Naperville's FY 2023-FY 2027 CIP. This project includes the replacement or major rehabilitation of the Washington Street bridge due to its deteriorating condition. In 2004, the bridge deck was repaired to extend the service life of the bridge by ten to fifteen years. The physical condition and the functionality of the bridge was evaluated in a feasibility report prepared in 2014 to determine an appropriate scope of work. The total cost of the project, including engineering, land acquisition, and construction is estimated range from $3,000,000 for rehabilitation work to $8,000,000 for full replacement and widening of the bridge and modifications to the adjacent sections of Washington Street to accommodate vehicular and pedestrian traffic. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents