Similar Projects
Pea Ridge Overflow Reduction Sanitary Sewer Improvements
Infrastructure
Bidding
$5,626,850 CJ est. value
Springfield, MO 65806

Johnston Drive Extension
Infrastructure
Bidding
$500,000 CJ est. value
Raymore, MO 64083

Removal and Installation of Submersible Recirculation Pump
Infrastructure
Sub-Bidding
Mexico, MO 65265

Rockhill Steam Line Replacement
Renovation, Alteration
Post-Bid
$1,453,000 est. value
Kansas City, MO 64110

Plumbing Services
Alteration
Post-Bid
MO

District Wide Drinking Fountain/Bottle Filler Installation
Alteration
Results
Hazelwood, MO

McCracken Road Dam Rehabilitation
Infrastructure
Results
$2,000,000 CJ est. value
Ozark, MO 65721

Plumbing
Renovation
Construction
$16,000 CJ est. value
Saint Charles, MO 63301

Northland Drive Improvement Project
Infrastructure
Bidding
$1,200,000 CJ est. value
Cameron, MO 64429

Pump and Triple Duty Valve Replacement - Hazelwood Opportunity Center
Alteration
Post-Bid
$30,000 est. value
Spanish Lake, MO 63138

Installation of Flow Meter
Infrastructure
Results
$126,365 CJ est. value
Saint Louis, MO 63103

Plumbing Services 2022
Term Contract
Post-Bid
Saint Louis, MO 63110

Eltora Wet Weather Storage Facility
Demolition, New Construction, Infrastructure
Results
$187,986 CJ est. value
Saint Louis, MO 63130

McClendon Ditch Sewer Improvements
Infrastructure
Post-Bid
$6,168,200 CJ est. value
Lees Summit, MO 64081

Water Main Improvements Hwy N & Z
Infrastructure
Results
$376,585 CJ est. value
Cottleville, MO 63366

Last Updated 07/25/2023 12:53 PM
Project Title

Pineville Water System Improvements

Physical Address View project details and contacts
City, State (County) Pineville, MO 64856   (McDonald County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $2,368,200 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project shall consist of installing a new well pump, water treatment system, water treatment building, new storage tank, new waterline, and necessary appurtenances to tie into the existing water supply system. All questions about the meaning or intent ofthe Bidding Documents are to be submitted to Engineer, Dominic Thompson, P.E. with Smith & Company, in writing Question Deadline 07/11/2023

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents