Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ Engineering - Foothills Mall Drive Extension Phase 2
Infrastructure
Conception
$622,000 CJ est. value
Maryville, TN 37801

Springbrook Tennis Court Resurfacing and Fence Demolition and Reconstruction
Infrastructure
Design
$30,000 CJ est. value
Alcoa, TN 37701

North End Booster Pump Stations
New Construction, Infrastructure
Bidding
$2,700,000 CJ est. value
Lenoir City, TN 37772

North End Booster Pump Stations
New Construction, Infrastructure
Bidding
$2,700,000 CJ est. value
Lenoir City, TN 37772

Directional Underground Boring
Term Contract
Sub-Bidding
Alcoa, TN 37701

1,400' Of 12" Class 50 Ductile Iron Pipe
Term Contract
Post-Bid
Alcoa, TN

Directional Boring Services
Term Contract, Infrastructure
Post-Bid
Maryville, TN

GRSM 158579/202623 - Look Rock Rehabilitation
Renovation
Results
$1,000,000 to $5,000,000 est. value
Maryville, TN

Ridge Road Water Main Improvements
Infrastructure
Results
Maryville, TN 37803

Topside Road Force Main Rehabilitation
Infrastructure
Bidding
$800,000 CJ est. value
Alcoa, TN 37777

Laurel Branch Park Site Preparation and Sewer Extension
Infrastructure
Post-Bid
Maryville, TN 37801

Rainbow Booster Pumping Station Piping Replacement
Infrastructure
Results
Mountain City, TN

Brookdale Road Extension
Infrastructure
Bidding
$600,000 CJ est. value
Maryville, TN 37801

Shooting Range Site Preparation
Infrastructure
Post-Bid
Maryville, TN 37801

Last Updated 08/05/2022 01:32 PM
Project Title

Construction of the Smith and Wesson Facility Pump Station and Force Main

Physical Address View project details and contacts
City, State (County) Maryville, TN 37804   (Blount County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,149,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Owner reserves the right to reject any or all bids and to waive any informalities or technicalities therein. The work to be done consists generally of: Contract "A" - the construction of a pre-engineered sanitary sewer lift station including lift station, wet well, site work, electrical service, fencing, gates, and all necessary appurtenances. Contract "B" - the construction of approximately 14,500 feet of 8-inch HDPE sanitary sewer force main including all necessary appurtenances. Each bid shall be accompanied by a Certified Check on a solvent bank or a Bidder's Bond issued by a Surety Company licensed to operate in the State of Tennessee, in the amount of five percent (5%) of the total bid price, as a guarantee that if the bid is accepted, the Bidder will enter into a contract and execute the Performance and Payment Bonds in the form and within the time specified. Each bid shall be accompanied by a DRUG-FREE WORKPLACE AFFIDAVIT if required under the provisions of Tennessee Code Annotated 50-9-113. The successful Bidder(s) will be required to execute a Performance Bond and a Payment Bond, issued by a Surety Company licensed to operate in the State and shall be named in the current list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Audit Staff Bureau of Accounts, U.S. Treasury Department. Each Bidder shall be a licensed Contractor as required by the regulations of the State of Tennessee General Assembly's Contractor's Licensing Act of 1976, and all amendments thereto in effect on bid receipt date. License number, expiration date, and license classification shall be shown on the outside of the envelope containing the bid of the General Contractor. The license number, expiration date, and license classification shall also be shown for the electrical subcontractor, plumbing subcontractor, and mechanical subcontractor. Failure to show these items on outside of envelope will result in bid being returned to Bidder unopened. No Bidder may withdraw his bid for a period of sixty (60) days after date of actual bid opening, without Owner's consent.

Details

Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents